Skip to main content

UK: Mott MacDonald reports £56 million FARRRS highway is open

Mott MacDonald Construction reports that the £56 million Finningley and Rossington Regeneration Route Scheme - FARRRS - in Doncaster, UK, has been completed and open. Mott MacDonald provided Doncaster Council with the majority of pre-construction services on the project. Planning for a link connecting the south of Doncaster to Junction 3 of the M18 started over a decade ago. The first phase, known as Great Yorkshire Way, comprises 1.5km of new dual carriageway and 3km of single carriageway. It also includes
March 21, 2016 Read time: 2 mins
2579 Mott MacDonald Construction reports that the £56 million Finningley and Rossington Regeneration Route Scheme - FARRRS - in Doncaster, UK, has been completed and open.

Mott MacDonald provided Doncaster Council with the majority of pre-construction services on the project.

Planning for a link connecting the south of Doncaster to Junction 3 of the M18 started over a decade ago. The first phase, known as Great Yorkshire Way, comprises 1.5km of new dual carriageway and 3km of single carriageway. It also includes two new rail as four new bridges over local watercourses.

The consultancy also provided project management support throughout and offered technical support during construction. Prior to construction Mott MacDonald carried out environmental and traffic appraisals, provided assistance at public consultations, prepared the planning application, drafted the compulsory purchase and side road orders and undertook the majority of design work.

Mott MacDonald is now providing similar services to the council for the second phase of FARRRS, which will complete the road from the A638 to Doncaster Sheffield Airport.

For more information on companies in this article

Related Content

  • Clever electric solution for embankment stabilisation
    August 28, 2013
    A highly innovative solution for road embankment stabilisation has helped save costs by up to 30% over conventional techniques. Balfour Beatty Mott MacDonald has used electrical current to stabilise embankments on a busy UK dual carriageway, avoiding disruption to motorists, cutting carbon by 40% and costs by 30%, and producing zero waste When slope failure was detected on embankments carrying the popular A21 dual carriageway, Balfour Beatty Mott MacDonald pioneered a novel technique to tackle the prob
  • Bridge replacement assembled overnight
    February 21, 2012
    Highways service provider Balfour Beatty Mott MacDonald has completed a major milestone in a project to replace a bridge for use by the local community over the M5 motorway near the city of Bristol, south-west England.
  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Fugro consulting for Amsterdam Zuidasdok project
    March 2, 2017
    Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are Fluor, Heijmans and HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it. The A10 South is one of the busiest highways in The Netherlands and