Skip to main content

UK: Mott MacDonald reports £56 million FARRRS highway is open

Mott MacDonald Construction reports that the £56 million Finningley and Rossington Regeneration Route Scheme - FARRRS - in Doncaster, UK, has been completed and open. Mott MacDonald provided Doncaster Council with the majority of pre-construction services on the project. Planning for a link connecting the south of Doncaster to Junction 3 of the M18 started over a decade ago. The first phase, known as Great Yorkshire Way, comprises 1.5km of new dual carriageway and 3km of single carriageway. It also includes
March 21, 2016 Read time: 2 mins
2579 Mott MacDonald Construction reports that the £56 million Finningley and Rossington Regeneration Route Scheme - FARRRS - in Doncaster, UK, has been completed and open.

Mott MacDonald provided Doncaster Council with the majority of pre-construction services on the project.

Planning for a link connecting the south of Doncaster to Junction 3 of the M18 started over a decade ago. The first phase, known as Great Yorkshire Way, comprises 1.5km of new dual carriageway and 3km of single carriageway. It also includes two new rail as four new bridges over local watercourses.

The consultancy also provided project management support throughout and offered technical support during construction. Prior to construction Mott MacDonald carried out environmental and traffic appraisals, provided assistance at public consultations, prepared the planning application, drafted the compulsory purchase and side road orders and undertook the majority of design work.

Mott MacDonald is now providing similar services to the council for the second phase of FARRRS, which will complete the road from the A638 to Doncaster Sheffield Airport.

For more information on companies in this article

Related Content

  • €180 million for Bosnia highway
    July 6, 2012
    The EBRD is investing in the largest infrastructure project in Bosnia-Herzegovina (BiH) to date by lending €180 million to the state to construct key sections of the Trans-European Corridor Vc. A key transport artery linking BiH with the rest of Europe, Corridor Vc starts in Budapest, Hungary and ends in the Adriatic Port of Ploce in Croatia. It runs north to south through the centre of BiH, and is the most strategically important link for regional trade and economic development. The €180 million EBRD finan
  • Denmark: construction of Storstrøm Bridge officially gets underway
    September 27, 2018
    Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
  • A new tunnel project for Turkey is a significant move
    December 12, 2012
    The European Bank for Reconstruction and Development (EBRD) is supplying a finance package worth US$150 million for the new Bosphorus crossing project in Turkey. Running under the Bosphorus at Istanbul, the new tunnel will connect both European and Asian sides of the city. The EBRD’s $150 million loan completes $1.4 billion worth of financing required for the Eurasia Tunnel project, being built under the Bosphorus straits. Other components of the $1.4 billion financing package for this PPP project include a
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost