Skip to main content

Uganda’s Jinja bridge open to traffic

Uganda’s Jinja Nile Bridge is now open to traffic. Costing US$129 million in all, around $100 million of the funding was supplied by Japan in the form of a loan. The 525m-long bridge features a cable-stayed design, the longest of its type in Uganda and second longest in East Africa after the 680m-long Kigamboni bridge in Tanzania, which also recently opened to traffic. Egypt’s Suez Canal Bridge is the longest cable-stayed type in Africa, measuring 3.9km, followed by the 1.36km Lekki Ikoyi Bridge in Nigeria
October 22, 2018 Read time: 1 min

Uganda’s Jinja Nile Bridge is now open to traffic. Costing US$129 million in all, around $100 million of the funding was supplied by Japan in the form of a loan. The 525m-long bridge features a cable-stayed design, the longest of its type in Uganda and second longest in East Africa after the 680m-long Kigamboni bridge in Tanzania, which also recently opened to traffic. Egypt’s Suez Canal Bridge is the longest cable-stayed type in Africa, measuring 3.9km, followed by the 1.36km Lekki Ikoyi Bridge in Nigeria and the 950m Mohammed VI Bridge in Morocco.

The new bridge provides an important connection for the Northern Corridor, running through Uganda and linking Kenya to the Democratic Republic of Congo.

Related Content

  • Widening and upgrade for highway in Nicaragua’s capital
    January 27, 2017
    Nicaragua is continuing to develop its highway network, this time with a major project planned for the capital, Managua. A loan worth close to US$107.5 million from the Central American Bank for Economic Integration (CABEI) is to help pay for the project. The work calls for the upgrade and widening of the Pista Juan Pablo II route running through Managua. The 9.55km stretch of road will benefit from three additional lanes, helping to boost capacity and reduce congestion and delays at peak periods. Safety pr
  • Self-climbing formwork solution for bridge pylons
    February 27, 2012
    Harsco Infrastructure has provided self-climbing formwork (SCF), which is helping ensure quick and safe access during the construction of a 320m tall pylon for the world’s longest cable-stayed bridge.
  • Demolition starts for Gerald Desmond Bridge
    July 14, 2022
    The 125m-long span will be dismantled, cut and lowered onto a barge in the waters around the Port of Long Beach in the US state of California.
  • Mauritania-Algeria road project planned
    July 26, 2022
    A new road project is planned to connect Mauritania and Algeria.