Skip to main content

Uganda’s Jinja bridge open to traffic

Uganda’s Jinja Nile Bridge is now open to traffic. Costing US$129 million in all, around $100 million of the funding was supplied by Japan in the form of a loan. The 525m-long bridge features a cable-stayed design, the longest of its type in Uganda and second longest in East Africa after the 680m-long Kigamboni bridge in Tanzania, which also recently opened to traffic. Egypt’s Suez Canal Bridge is the longest cable-stayed type in Africa, measuring 3.9km, followed by the 1.36km Lekki Ikoyi Bridge in Nigeria
October 22, 2018 Read time: 1 min

Uganda’s Jinja Nile Bridge is now open to traffic. Costing US$129 million in all, around $100 million of the funding was supplied by Japan in the form of a loan. The 525m-long bridge features a cable-stayed design, the longest of its type in Uganda and second longest in East Africa after the 680m-long Kigamboni bridge in Tanzania, which also recently opened to traffic. Egypt’s Suez Canal Bridge is the longest cable-stayed type in Africa, measuring 3.9km, followed by the 1.36km Lekki Ikoyi Bridge in Nigeria and the 950m Mohammed VI Bridge in Morocco.

The new bridge provides an important connection for the Northern Corridor, running through Uganda and linking Kenya to the Democratic Republic of Congo.

Related Content

  • Saudi Arabian capital Riyadh benefiting from major transport investment
    September 9, 2013
    Saudi Arabia is undergoing a series of upgrades to its transport network in a bid to improve Traffic flow rates and boost safety - Mike Woof reports. The massive growth in the use of motor transport worldwide since the start of the 20th century has transformed every country on the planet. But perhaps no country has changed more dramatically than Saudi Arabia, the world’s leading oil producer. At the start of the 20th century Saudi Arabia’s population was small and the country had few industries while it is
  • A key section of highway is now open in Romania
    July 26, 2012
    In Romania the northern section of the bypass around the city of Constanta is open to traffic. The bypass forms part of the Pan-European Road Corridor IV and work on this section was financed by the European Bank for reconstruction and Development (EBRD). The southern stretch of the 23km bypass was completed in 2011. Now it is complete, the bypass will carry heavy port traffic away from Constanta. It will also provide a free-flowing route for tourist traffic from Romanian capital Bucharest and the north of
  • Performance-Based Contracting for Sustainable Road Networks
    October 18, 2016
    The Africa Regional Seminar and Workshop delivers key recommendations on performance-based contracts. The International Road Federation (IRF) Geneva has helped co-organise the Africa Regional Seminar and Workshop on "Performance-based Contracts for Roads." This was organised and run jointly with local support from the Tanzania Ministry of Works, Transport, and Communications, the Road Fund Board, TANROADS, the Tanzania Transportation Technology Transfer Centre and the Tanzania Roads Association (TARA). Also
  • Road improvement works for Tanzania
    June 27, 2022
    Road improvement works are planned for Tanzania.