Skip to main content

Uganda’s Jinja bridge open to traffic

Uganda’s Jinja Nile Bridge is now open to traffic. Costing US$129 million in all, around $100 million of the funding was supplied by Japan in the form of a loan. The 525m-long bridge features a cable-stayed design, the longest of its type in Uganda and second longest in East Africa after the 680m-long Kigamboni bridge in Tanzania, which also recently opened to traffic. Egypt’s Suez Canal Bridge is the longest cable-stayed type in Africa, measuring 3.9km, followed by the 1.36km Lekki Ikoyi Bridge in Nigeria
October 22, 2018 Read time: 1 min

Uganda’s Jinja Nile Bridge is now open to traffic. Costing US$129 million in all, around $100 million of the funding was supplied by Japan in the form of a loan. The 525m-long bridge features a cable-stayed design, the longest of its type in Uganda and second longest in East Africa after the 680m-long Kigamboni bridge in Tanzania, which also recently opened to traffic. Egypt’s Suez Canal Bridge is the longest cable-stayed type in Africa, measuring 3.9km, followed by the 1.36km Lekki Ikoyi Bridge in Nigeria and the 950m Mohammed VI Bridge in Morocco.

The new bridge provides an important connection for the Northern Corridor, running through Uganda and linking Kenya to the Democratic Republic of Congo.

Related Content

  • Dragados among six in the running for fourth Panama bridge deal
    August 23, 2016
    All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
  • Innovative formwork beats bridge design challenges
    February 14, 2012
    Companies are coming up with innovative formwork solutions to overcome "challenging" designs for bridges. Patrick Smith reports
  • Delayed Houston Ship Canal Bridge nearing first phase
    February 23, 2024
    The delayed Houston Ship Canal Bridge is nearing its first phase completion.
  • Road rebuilding and rehabilitiation revitalising Rwanda
    October 4, 2013
    In Rwanda a road rehabilitation project will see the rebuilding of the route connecting Huye and Kitabi. The work on the 53km road will be supervised by Rwanda’s Ministry of Infrastructure and is due for completion by 2017. A loan worth SU$10 million from the Arab Bank for Economic Development (Badea) will help to finance the work on the road, which lies in Rwanda’s Southern Province. Badea is a financial institution owned by 18 Arab countries members of the League of Arab States (LAS). In all, the project