Skip to main content

UAE: Mohammed Bin Zayed City to get road improvements

Major roadworks within Mohammed Bin Zayed City are among recently announced projects, including electricity, street-lighting and storm-water drainage systems, to be funded by more than US$128 million. The projects covered by the funding were announced by Abu Dhabi officials in the United Arab Emirates. Earlier this year, the Roads and Transport Authority in Dubai awarded contracts worth $131 million for a series of road, bridge, crossing and tunnel upgrades. The projects include a new flyover, a signa
March 14, 2016 Read time: 2 mins
Major roadworks within Mohammed Bin Zayed City are among recently announced projects, including electricity, street-lighting and storm-water drainage systems, to be funded by more than US$128 million.

The projects covered by the funding were announced by Abu Dhabi officials in the United Arab Emirates.

Earlier this year, the Roads and Transport Authority in Dubai awarded contracts worth $131 million for a series of road, bridge, crossing and tunnel upgrades. The projects include a new flyover, a signalised at-grade junction, an intersection improvement, new key surface roads and improved service roads. All of the projects are scheduled for completion in the first quarter of 2018.

Meanwhile, road safety is improving in the UAE, according to official data released the Traffic Coordination General at the Interior Ministry. Between January and October last year deaths on the UAE’s roads dropped 4.9% while serious injuries fell by 5.1%.

The number of deaths was 560, compared with 589 for the same period in 2014. The total number of injuries registered in the period was 5,605, compared to 5,909. The number of traffic crashes reported in the January to October 2015 declined 3% from 4,058 in the same period in 2014, to 3,935.

The major cause of crashes was from sudden swerving, accounting for 19.44% of the total number of incidents. Failure to maintain a safe distance between vehicles came in second and resulted in 13% of crashes.

Related Content

  • Engine maker Deutz dumps full-year 2015 forecast amid poor trading
    September 16, 2015
    German engine maker Deutz Group said it will not meet its forecast for the current financial year. A sluggish second quarter with “very low” new orders means revenue is expected to fall by around 20% compared with the forecasted 10% drop, according to a corporate statement. “Consequently, the second half of 2015 will be significantly worse than the first half of the year,” the statement said. “Given the low level of business, Deutz will only be just about break even in terms of EBIT this year. Unt
  • New data shows continued fall in KSI figures on UK roads
    June 27, 2013
    The UK’s road safety is improving according to the latest set of official statistics. According to the Department for Transport (DfT) figures, 1,754 people were killed on the UK’s roads in 2012, a drop of 8% from the figure for 2011 and the lowest level since national records commenced in 1926. Meanwhile 23,039 people suffered serious injuries in road crashes, 0.4% lower than the 23,122 in 2011 but 15% lower than the average for the 2005-2009 period. The number of child casualties fell 17% to 17,251 compare
  • Contacts awarded for new UAE road links
    October 8, 2013
    Contracts for two major road projects in the United Arab Emirates (UAE) worth a combined US$2.01 billion (AED 7.40 billion) have been awarded. The contracts have been granted to Al Jaber Transport and General Contracting, Ghantoot Transport and General Contracting, Al Geemi & Partners Contracting Company, Bin Hafeez General Contracting Establishment, Delma Engineering, Larsen and Toubro, Abu Dhabi Salini Construction and Tristar for Engineering. One of the road projects will connect Dubai with Abu Dhabi,
  • UAE-Saudi Arabia highway connection
    February 1, 2018
    Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included