Skip to main content

Two more construction tenders for Slovakia’s R2 by end of 2018

Arpad Ersek, Slovakia's Minister of Transport, said another two tenders for construction of two R2 expressway stretches will be called by the end of 2018. They will include the stretch Roznava-Jablonov nad Turnou with the Soroska tunnel and the Kosice, Saca-Kosicke Olsany. In both cases financing has been secured. They could be financed through a loan or through the PPP scheme (public-private partnership). Ersek added that the ministry should receive an additional funds of up to €200 million through r
November 7, 2018 Read time: 1 min
Arpad Ersek, Slovakia's Minister of Transport, said another two tenders for construction of two R2 expressway stretches will be called by the end of 2018.


They will include the stretch Roznava-Jablonov nad Turnou with the Soroska tunnel and the Kosice, Saca-Kosicke Olsany. In both cases financing has been secured.

They could be financed through a loan or through the PPP scheme (public-private partnership). Ersek added that the ministry should receive an additional funds of up to €200 million through re-allocation of EU funds from other ministries which do not use up their EU fund allocations.

Last month, Slovakia announced that bidding for the R2 Krivan-Mytna expressway project - handled by the local highway firm NDS- had been extended. Bids opened in and will be closed this month. The project for the 9.1km route is expected to cost €280 million to build and should take 48 months to complete.

Related Content

  • Strabag-led consortium wins €178 million R2 Slovakia expressway contract
    November 22, 2013
    A consortium led by the European construction group Strabag has signed the €178 million contract to build the 10.4km long section of the R2 expressway between Pstruša and Kriván in Slovakia. The R2 expressway runs through the valley of the Slatina River in central Slovakia and links the cities of Pstruša and Kriván. “After years of restraint in public-sector expenditures, the Slovak construction industry is again beginning to recover. We are bidding for several large contracts that are currently in the t
  • Delay for Tvrdosin-Nizna R3 section in Slovakia
    June 22, 2023
    The NDS agency has not reported by how much the contracted cost of €62 million will rise.
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th