Skip to main content

Turkmenistan starts construction of Ashgabat-Turkmenbashi road

Turkmenistan has started construction of the 544km Ashgabat-Turkmenbashi highway under a public-private partnership contract. The deal is expected to cost between US$800-900 million for every 2km or so of road construction from Ashgabat in central Turkmenistan to Turkmenbashi, a city of around 90,000 on the eastern coast of the Caspian Sea. For a YouTube video graphic representation of the highway, click here. To see World Highways report onTurkmenistan’s highways projects in 2011, click here. Türkmenb
May 8, 2015 Read time: 1 min
Turkmenistan has started construction of the 544km Ashgabat-Turkmenbashi highway under a public-private partnership contract.

The deal is expected to cost between US$800-900 million for every 2km or so of road construction from Ashgabat in central Turkmenistan to Turkmenbashi, a city of around 90,000 on the eastern coast of the Caspian Sea.

For a YouTube video graphic representation of the highway, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here View Youtube Video false https://www.youtube.com/watch?v=bWZpUawA3p8 false false%>. To see 3260 World Highways report onTurkmenistan’s highways projects in 2011, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2426 0 oLinkExternal click here Visit highway developments to boost east west transport Page false /sections/key-projects/features/highway-developments-to-boost-east-west-transport/ false false%>.

Türkmenbaşi is Turkmenistan's only port and sea link to the West. A ferry service connects Türkmenbaşi to Baku, Azerbaijan.

The government also has plans to make Turkmenbashi a centre for tourism and announced in 2007 plans to spend $1 billion and seek additional foreign investment to create a major tourist resort on the Caspian Sea.

For more information on companies in this article

Related Content

  • Simem brings concrete batching plant to bauma
    January 6, 2017
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also
  • Simem brings concrete batching plant to bauma
    April 22, 2013
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also
  • Steering on drums: the Dynapac CG2300 roller
    February 13, 2013
    Having a long tradition of CG rollers, without central articulation, but with steering on drums, Atlas Copco’s Road Construction Equipment division now launches the Dynapac CG2300 asphalt roller. The roller is 3.95m long and 3m high with an inner turning radius of 3.1m. This means transportation advantages as well as ease of working in restricted areas.
  • SIMEM soaring with EAGLE portable plant range
    April 8, 2013
    SIMEM will be showcasing its EAGLE range of portable plants at bauma 2013 – said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to the EAGLE plants swift portability from one project to the other, preserving its capital value. The state-of-the-art supermobile MMX range of plants from SIMEM, said to be the best solution available for faster moving job-sites such as railways and highways, wi