Skip to main content

Turkish highways and bridge project financing secured

The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance
June 7, 2018 Read time: 2 mins
The new bridge represents a stepping point for bridge engineering
The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from 2579 Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance of 70m at its centre to allow shipping to pass underneath, with 318m high steel towers built on concrete caissons in the Çanakkale Strait. As the bridge is located in a seismic zone, it has been designed to withstand large earthquakes and is also being built to cope with severe winds.


Other construction works include the 88km highway between Malkara and Çanakkale, 48km of connection roads, 35km of access roads, six junctions, four viaducts, 36 overpasses, 33 underpasses and 140 culverts, as well as four service areas and tolling facilities.

Mott MacDonald’s work included reviewing design, construction methodology, operation and maintenance proposals, as well as transaction documents, the project’s budget, construction programme and payment mechanism. The consultancy will now provide construction and operations monitoring services in an ongoing role.

Emre Yukarioglu, Mott MacDonald’s project manager, said: “The project, which involves 24 lenders including local and international banks and export credit agencies, is part of a greater development plan devised by the Turkish Directorate of Highways to complete a ring road around Marmara. Our local team based in Istanbul, supported by long-span bridge experts and our transport advisory team from the UK, worked hard to support a large lending group and comply with the tight timeline to bring the project to financial close.”

Construction of the Malkara – Çanakkale Motorway PPP, which has a concession period of just over 16 years, is expected to be completed by the end of 2021. Other firms involved in the project include Daelim, Limak, SK Engineering and Yapı Merkezi.

For more information on companies in this article

Related Content

  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Eurasia Tunnel wins prestigious IRF award
    March 8, 2018
    New road connection linking Europe to Asia scoops IRF Global Road Achievement Award The Eurasia Tunnel was built to connect the Asian and European sides of Istanbul for the first time via a 3.4km twin-deck road tunnel going underneath the seabed. The 14.6km Eurasia Tunnel route was identified based on extensive feasibility studies conducted in 2005 for the Ministry of Transport, Maritime Affairs and Communications of Turkey. Its main aim was to relieve Istanbul’s transcontinental traffic pressure, reduce
  • Poland bidders angry over Astaldi win for Warsaw Ring Road work
    June 18, 2015
    Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev