Skip to main content

Turkish highways and bridge project financing secured

The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance
June 7, 2018 Read time: 2 mins
The new bridge represents a stepping point for bridge engineering
The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from 2579 Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance of 70m at its centre to allow shipping to pass underneath, with 318m high steel towers built on concrete caissons in the Çanakkale Strait. As the bridge is located in a seismic zone, it has been designed to withstand large earthquakes and is also being built to cope with severe winds.


Other construction works include the 88km highway between Malkara and Çanakkale, 48km of connection roads, 35km of access roads, six junctions, four viaducts, 36 overpasses, 33 underpasses and 140 culverts, as well as four service areas and tolling facilities.

Mott MacDonald’s work included reviewing design, construction methodology, operation and maintenance proposals, as well as transaction documents, the project’s budget, construction programme and payment mechanism. The consultancy will now provide construction and operations monitoring services in an ongoing role.

Emre Yukarioglu, Mott MacDonald’s project manager, said: “The project, which involves 24 lenders including local and international banks and export credit agencies, is part of a greater development plan devised by the Turkish Directorate of Highways to complete a ring road around Marmara. Our local team based in Istanbul, supported by long-span bridge experts and our transport advisory team from the UK, worked hard to support a large lending group and comply with the tight timeline to bring the project to financial close.”

Construction of the Malkara – Çanakkale Motorway PPP, which has a concession period of just over 16 years, is expected to be completed by the end of 2021. Other firms involved in the project include Daelim, Limak, SK Engineering and Yapı Merkezi.

For more information on companies in this article

Related Content

  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • Turkey’s important new tunnel will improve transport links
    May 18, 2016
    Major advances in tunnelling will allow cars to travel underneath the Bosphorus sea channel in Turkey's Istanbul next year when its third road link is opened, writes Adrian Greeman. The Bosphorus is redolent with history and strategic significance. As one of the world's most significant sea connections, linking the landlocked Black Sea to the Marmara Sea and the Mediterranean beyond, it has been vitally important for trade and crucial for military access. It is also one of the biggest obstacles for land tra
  • Haulotte wraps it up at Turkey’s Osman Gazi Bridge
    July 5, 2016
    French access group Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge. The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central
  • Seven bids submitted for Croatia’s Peljeski bridge access roads
    June 18, 2018
    Croatia’s construction company Integral Inzinjering has submitted the lowest bid of €43 million for construction of access roads for the Peljeski bridge project. Croatian daily newspaper Vecernji List reported that seven bidsd were submitted for the 12.4km project. Highest bid of €88 million has come from China Road and Bridge Corporation, which has the contract to build the bridge. Austria's Strabag offered €65 million. Other bidders were France's Colas, Croatia's GP Krk in cooperation with the Bosni