Skip to main content

Trans-Sumatra Highway toll road project

The Trans-Sumatra Highway toll road project is being prioritised.
By MJ Woof June 8, 2020 Read time: 1 min
Work is being prioritised on Indonesia’s Trans-Sumatra toll road project – image courtesy of © 350jb, Dreamstime.com


Indonesia is prioritising work on the Trans-Sumatra toll road project. Three sections of the route are to benefit from new funding sources.

Funding worth US$725.8 million is being sourced from the Indonesian Government to pay for the work. The three sections to benefit run between Pekanbaru and Dumai, Simpang Indralaya and Muara Enim and also Pekanburu and Pangkalan. These stretches measures 131km, 119km and 95km respectively.

In all, the route of the Trans-Sumatra toll road runs for some 2,765km, connecting Lampung on Sumatra’s southern tip and Aceh in the north.

Related Content

  • Trans-Sahara highway upgrade project complete
    May 8, 2018
    Work has now been completed on Algeria’s upgrade of its 1,600km of the Trans-Sahara highway route.
  • New bridge planned for key Indonesia link
    July 22, 2013
    A feasibility study worth US$199 million will be carried out for the planned Sunda Straits Bridge in Indonesia. The bridge itself is expected to cost close to $20 billion to construct. It will be of major economic importance for Indonesia by providing a direct road link between the islands of Sumatra and Java. The link will connect Sumatra directly to Indonesia’s capital, Jakarta, and the bridge is expected to be 27km long in all. The Sunda Straits Bridge will actually be a series of links connecting the sm
  • US$690 million for Indonesia toll tunnel
    September 3, 2024
    Funding worth US$690 million is planned for Indonesia’s toll tunnel.
  • Indonesia cancels Sunda Strait Bridge connecting Java and Sumatra
    November 11, 2014
    Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project. The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity. But the Jakarta Post newspaper reported that recently elected President Joko Widodo had