Skip to main content

Trans-Sumatra Highway toll road project

The Trans-Sumatra Highway toll road project is being prioritised.
By MJ Woof June 8, 2020 Read time: 1 min
Work is being prioritised on Indonesia’s Trans-Sumatra toll road project – image courtesy of © 350jb, Dreamstime.com


Indonesia is prioritising work on the Trans-Sumatra toll road project. Three sections of the route are to benefit from new funding sources.

Funding worth US$725.8 million is being sourced from the Indonesian Government to pay for the work. The three sections to benefit run between Pekanbaru and Dumai, Simpang Indralaya and Muara Enim and also Pekanburu and Pangkalan. These stretches measures 131km, 119km and 95km respectively.

In all, the route of the Trans-Sumatra toll road runs for some 2,765km, connecting Lampung on Sumatra’s southern tip and Aceh in the north.

Related Content

  • US$528 million loan for Indonesia port
    January 22, 2025
    A US$528 million loan will pay for an Indonesia port upgrade
  • New highway works planned for India
    February 10, 2025
    Major new highway works are planned for India.
  • Funding sources being sought for Indian highways
    January 25, 2016
    India’s Ministry of Transport and Highways is looking to source loans to help fund highway development. The Japan International Cooperation Agency (JICA) looks set to provide a partial source for the funding required. In all just over US$885 million will be needed to pay for India’s National Highway Development Project (NHDP). The Japan International Cooperation Agency (JICA) has approved a loan of just over $590 million for the Indian Government-run National Highways and Infrastructure Development Corp (NH
  • Jasa Marga picks up a loan for the Medan-Kualanamu project
    April 27, 2015
    In Indonesia, state-controlled toll road operator Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project. The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI. The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May. Jasa Marga operates and manages 13 toll road concessions directly and nin