Skip to main content

Trans-Sumatra Highway toll road project

The Trans-Sumatra Highway toll road project is being prioritised.
By MJ Woof June 8, 2020 Read time: 1 min
Work is being prioritised on Indonesia’s Trans-Sumatra toll road project – image courtesy of © 350jb, Dreamstime.com


Indonesia is prioritising work on the Trans-Sumatra toll road project. Three sections of the route are to benefit from new funding sources.

Funding worth US$725.8 million is being sourced from the Indonesian Government to pay for the work. The three sections to benefit run between Pekanbaru and Dumai, Simpang Indralaya and Muara Enim and also Pekanburu and Pangkalan. These stretches measures 131km, 119km and 95km respectively.

In all, the route of the Trans-Sumatra toll road runs for some 2,765km, connecting Lampung on Sumatra’s southern tip and Aceh in the north.

Related Content

  • Indian highway projects awarded
    December 6, 2019
    The National Highways Authority of India (NHAI) has awarded a series of highway projects in Telengana State.
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
  • Colorado toll road project receives funding
    May 5, 2017
    Funding is being provided for the construction of new tolled lanes on a highway close to Denver, Colorado. The funding will be provided by the US Federal Government in the form of a loan worth US$109 million. In all the project will cost $276 million, with the state providing the majority of the remaining funding required. The funding will be used to widen a 20km section of the route connecting Wadsworth Boulevard with Interstate 25. The widening work is expected to be complete by 2019 and is intended to he
  • Tanzania-Uganda road development funding source
    November 20, 2017
    Preparation work for the improvement of the road connecting Uganda with Tanzania is being provided by the African Development Bank (AfDB). Funding worth US$1.5 million is being given by the AfDB to pay for the preparation work. The new road will connect Masaka in Uganda with Kagera in Tanzania and forms part of a programme to improve connections across East Africa. The road project is being carried out in three separate sections. One stretch measures 133km and runs from Kumunazi, through Bugene to Kasulo in