Skip to main content

Trans-Sumatra Highway toll road project

The Trans-Sumatra Highway toll road project is being prioritised.
By MJ Woof June 8, 2020 Read time: 1 min
Work is being prioritised on Indonesia’s Trans-Sumatra toll road project – image courtesy of © 350jb, Dreamstime.com


Indonesia is prioritising work on the Trans-Sumatra toll road project. Three sections of the route are to benefit from new funding sources.

Funding worth US$725.8 million is being sourced from the Indonesian Government to pay for the work. The three sections to benefit run between Pekanbaru and Dumai, Simpang Indralaya and Muara Enim and also Pekanburu and Pangkalan. These stretches measures 131km, 119km and 95km respectively.

In all, the route of the Trans-Sumatra toll road runs for some 2,765km, connecting Lampung on Sumatra’s southern tip and Aceh in the north.

Related Content

  • Indonesia’s new toll road link
    March 25, 2019
    Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and C
  • Indonesia toll road projects – deals being arranged
    October 26, 2018
    A series of major toll road projects are being planned for Indonesia.
  • Chinese loan to fund Kenya road project
    December 2, 2016
    A loan from the China Exim Bank will help pay for a new road project in Kenya. The loan is being offered to Kenya’s Government and is worth US$227.2 million, around 46% of the sum required for the whole 472km road project. The project is being handled in three phases, with this loan being sufficient for the first 192km stretch that will connect Kibwezi with Kitui, running through Mutomo. This first section will be constructed by Chinese contractor Sinohydro. The second stretch of the project will measure 16
  • Indonesia toll road being evaluated
    March 1, 2018
    A proposed toll road project for the Indonesian island of Java is now being evaluated. The feasibility study for the project is being carried out by the Priority Infrastructure Preparation Committee (KPPIP). The US$887.3 million project is for the Bawen to Yongjakarta toll road link, running roughly north to south across Central Java. The 71km route has been proposed by Indonesia's Ministry of Public Works and Housing Committee. The route will feature an elevated section.