Skip to main content

Trans-Sumatra Highway toll road project

The Trans-Sumatra Highway toll road project is being prioritised.
By MJ Woof June 8, 2020 Read time: 1 min
Work is being prioritised on Indonesia’s Trans-Sumatra toll road project – image courtesy of © 350jb, Dreamstime.com


Indonesia is prioritising work on the Trans-Sumatra toll road project. Three sections of the route are to benefit from new funding sources.

Funding worth US$725.8 million is being sourced from the Indonesian Government to pay for the work. The three sections to benefit run between Pekanbaru and Dumai, Simpang Indralaya and Muara Enim and also Pekanburu and Pangkalan. These stretches measures 131km, 119km and 95km respectively.

In all, the route of the Trans-Sumatra toll road runs for some 2,765km, connecting Lampung on Sumatra’s southern tip and Aceh in the north.

Related Content

  • Indonesian road projects planned
    November 27, 2020
    Indonesian road projects are being planned.
  • More funding needed for key Indonesian project
    July 27, 2023
    More funding is needed for a key Indonesian road project.
  • Indonesia’s Trans Marga Jateng secures key new toll road loan
    April 8, 2014
    A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola
  • Indonesia’s toll roads under development
    July 18, 2019
    Indonesia is working on plans to develop its toll road network during 2019. A further 400km of new toll roads will be completed during 2019, bringing Indonesia’s total toll road length to 2,000km in all. Key toll road sections due for completion include stretches of the Jakarta Outer Ring Round 2 and the Balikpapan-Samaridan toll road. Indonesia’s Trans-Sumatra toll road is one of the country’s key projects, with some 561km of the route due to be in use by the end of 2019. The Balikpapan-Samarinda toll road