Skip to main content

Trans-Sumatra costs reach $1.7 billion, according to Hutama Karya

The cost for completing the three toll road sections of the Trans-Sumatra project will be almost US$1.7 billion, according to a major Indonesian construction firm. Hutama Karya is working on the 140km stretch from Bakauheni-Terbangi Besar, the 28km Palembang-Simpang Indralya section and the 18km Medan-Binjai stretch, said the company’s managing director, Gusti Ngurah Putera The Trans-Sumatran Highway is the primary north-south road, running around 2,500km on the island of Sumatra. It connect the north
November 14, 2016 Read time: 1 min
The cost for completing the three toll road sections of the Trans-Sumatra project will be almost US$1.7 billion, according to a major Indonesian construction firm.

5206 Hutama Karya is working on the 140km stretch from Bakauheni-Terbangi Besar, the 28km Palembang-Simpang Indralya section and the 18km Medan-Binjai stretch, said the company’s managing director, Gusti Ngurah Putera

The Trans-Sumatran Highway is the primary north-south road, running around 2,500km on the island of Sumatra. It connect the north of the island in Banda Aceh to Bandar Lampung in the south, running through many major cities, including Medan and Padang.

Last December, World Highways reported that a loan of $91 million had been signed between Indonesian infrastructure financing company Sarana Multi Infrastrucktur (SMI) and Hutama Karya. The money for work on the 22km Palembang-Indrayala stretch of the Trans Sumatra.

For more information on companies in this article

Related Content

  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • India’s US$2.2 billion Mumbai Trans Harbour Link opens
    January 12, 2024
    India’s US$2.2 billion Mumbai Trans Harbour Link is being opened to traffic.
  • Saudi re-opens Jadeedah Arar crossing
    December 4, 2020
    After a 50km upgrade, the Saudi road into Iraq officially re-opens.
  • Five consortia vie for Paraguay’s first phase of bi-oceanic corridor
    March 14, 2016
    Five consortia are vying for the contract to pave 255km of Paraguay’s bi-oceanic corridor project - the Loma Plata-Carmelo Peralta road paving works. The five consortia are INECS, EPI, ACI Proyectos Cialpa, Geocon-MCSA and Loma Plata. The 255km contract is the first phase, costing US$300 million, of a 1,045km overall corrider that will need around $926 million. Tenders for the first phase were launched in November covering the section between Carmelo Peralta, Cruce Centinela and Loma Plata in the w