Skip to main content

Trakcja and Mostostal Warszawa pick up S61 deal in Poland

A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions. The work, costing around €159 million, is scheduled for completion in June 2021. The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Ba
July 25, 2018 Read time: 1 min
A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions.


The work, costing around €159 million, is scheduled for completion in June 2021.

The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Baltic region’s states.

Related Content

  • Preparations for Polish project – widening work
    December 13, 2018
    Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
  • Metrostav and Budimex among bidders for Poland’s S7 section
    April 25, 2017
    Poland’s highways directorate, GDDKiA, says 12 bids have been received for construction of the second section of the S7 dual carriageway. The 15km section will run from the Lesznowola junction to the Tarczyn Polnoc junction. Metrostav submitted the highest offer at €118 million, while the cheapest offer came from a consortium of Porr Polska Infrastructure and Porr Bau. Other bidders include others, Budimex, Intercor and Polaqua.
  • Polish highway deals
    March 2, 2012
    Tenders are being evaluated for a 37km section of the S3 dual carriageway between Gorzow Wielkopolski and Miedzyrzecz in Poland.
  • Poland: S6 expressway and A2 motorway receive EU funding
    November 23, 2018
    Subsidies worth more than €228 have been granted by the European Union for the construction of the S6 expressway section to link Slupsk with Gdansk. Also, around €77 million from the EU has been granted for the A2 section between Warsaw and Minsk Mazowiecki. The S6 section will be almost 41km long and will cost over €470 million is expected to be completed in October 2021. The 15km A2 section is due to be ready in June 2020 at a total cost of €193 million.