Skip to main content

Thailand rekindles interest in the motorway in Bang Pa-in

The Thai government expects to announce contractors for construction of two motorway sections this month after steel price hikes derailed a recent tender process. The sections are part of the 196km motorway connecting Bang Pa-in district in Ayutthaya with Nakhon Ratchasima in the northeast, according to a report in the Bangkok Post. The project, costing nearly US$2 billion, is divided into 40 sections, 25 of which are scheduled to be built this year. But the Highways Department has signed only one con
July 6, 2016 Read time: 2 mins
The Thai government expects to announce contractors for construction of two motorway sections this month after steel price hikes derailed a recent tender process.

The sections are part of the 196km motorway connecting Bang Pa-in district in Ayutthaya with Nakhon Ratchasima in the northeast, according to a report in the Bangkok Post.

The project, costing nearly US$2 billion, is divided into 40 sections, 25 of which are scheduled to be built this year. But the Highways Department has signed only one contractor so far, for construction of a 3.6km section in Saraburi, the Post reported. The department had to cancel the bidding on five sections because the winners -- Italian-Thai Development and Nawarat Patanakarn – raised their prices after a 40% rise in steel prices.

The Post quoted unnamed sources in the Highways Department saying discussions failed between the government and two winners to reach a new price, meaning another bidding round will be scheduled. The department is also now revising its own cost estimates for the highway construction.

Related Content

  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • Boom in Asian infrastructure investment
    February 8, 2012
    Investment in China and India continues unabated, but other nations on the continent are eager to attract companies as Patrick Smith reports Asia is still booming despite the current economic crisis, and new infrastructure programmes are constantly coming on stream. Powerhouses China and India, with their double-digit growth figures and huge infrastructure plans (in scope and cost), are leading the way and are still magnets for businesses wishing to expand, both in terms of facilities and customers. But oth
  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • New study suggests Fehmarn Belt payback close to 50 years
    October 9, 2015
    A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an