Skip to main content

Thailand highway and bridge projects underway

Plans are being up in Thailand’s capital Bangkok for a new expressway project in a bid to cut the city’s chronic congestion problem. This new route would provide a connection between the Western Outer Ring Road and Rama II Road. The project is being planned by the Expressway Authority of Thailand (Exat). Financing for the project worth US$918.3 million will be provided by the Thailand Future Fund (TTF). The new route will include an elevated stretch from Rama II's traffic island towards the Western Outer Ri
September 27, 2017 Read time: 2 mins
Plans are being up in Thailand’s capital Bangkok for a new expressway project in a bid to cut the city’s chronic congestion problem. This new route would provide a connection between the Western Outer Ring Road and Rama II Road. The project is being planned by the Expressway Authority of Thailand (Exat). Financing for the project worth US$918.3 million will be provided by the Thailand Future Fund (TTF). The new route will include an elevated stretch from Rama II's traffic island towards the Western Outer Ring Road. It will also include a suspension bridge with eight lanes running parallel to the Rama IX bridge. The tender process is expected to be run in December 2017 with the winner being selected in the first three months of 2018.


Meanwhile plans are also being made for a new bridge that will span the Chao Phraya River that is intended to help cut congestion in the area. The project is being planned by the Rural Roads Department of Thailand, with the new crossing located close to Sanambin Nam Road. The new bridge will form part of a 10km link from Rachaphruek Road on one side of the Chao Phraya River to Tambon Tha It at Nonthaburi with Ngam Won Wan Road's Wat Buakhan temple and Sanambin Nam Road. There has been some resistance to the bridge project as it involves up to 200 homes having to be relocated.

Related Content

  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • New Thames River bridge crossing proposed for UK capital London
    July 2, 2014
    Plans are once more being put forward for a new bridge spanning the River Thames in East London. The proposed structure is expected to cost in the region of €750 million (£600 million) to build and has been designed by Arup and HOK. The campaign for the new bridge is being led by the London Chamber of Commerce and Industry (LCCI), which says that there is a desperate need for an additional crossing. The campaign group also has the support of City Airport, which lies on the north side of the Thames and would
  • Thailand’s latest expressway deals being arranged
    July 19, 2019
    Chinese companies look likely to play key roles in major expressway construction projects in Thailand. The Rama III-Dao Khanong-Western Bangkok Outer Ring Expressway project is being handled in four separate sections, with the deals being finalised in September 2019. Major Chinese contractors are amongest the leading bidders for three of the four sections.
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha