Skip to main content

Texas highway project awarded

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. Fluor Corporation heads the joint venture, which also includes Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the Texas Department of Transportation (TxDOT). The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, th
May 31, 2019 Read time: 2 mins

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. 6343 Fluor Corporation heads the joint venture, which also includes 1146 Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the 3499 Texas Department of Transportation (TxDOT).

The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, the contract includes an option for Fluor to provide capital maintenance services following construction of the project. Fluor anticipates the company will book the contract value in the third quarter of 2019.

The I-635 LBJ East Project will improve the capacity and efficiency of the portion of the I-635 loop around north and east Dallas from east of US Highway 75 to I-30. This includes significant reconstruction and improvements to the I-30 interchange and a section of I-30 from west of Gus Thomasson Road to east of N. Galloway Avenue in Dallas County, Texas.

The project includes adding a general purpose lane in each direction and rebuilding the existing managed lane in each direction to this section of I-635. The project will also feature the construction of continuous frontage roads with numerous intersection improvements for the frontage roads and cross streets to function more efficiently, including the design and construction of a signature bridge at the Skillman/Audelia intersection. The goal is to improve mobility and reduce traffic congestion in a main Dallas-Fort Worth commuter corridor that carries more than 200,000 vehicles/day. The completed project is also expected to improve safety and mobility within the I-635 corridor as well as improve the access to existing roadway connections and should be ready for traffic in 2024.

For more information on companies in this article

Related Content

  • Stantec wins upgrade to Florida SR 91
    July 29, 2019
    Canadian contractor Stantec is to lead design work for a 16km upgrade and widening of State Road 91 in the US state of Florida. Work will turn the section of road through Lake County into price-managed lanes for improved travel reliability, according to the company which will be working for Florida’s Turnpike Enterprise, part of the Florida Department of Transportation. Turnpike Enterprise operates a 740km-system of limited access toll highways Stantec’s design for the project, with a construction cos
  • New Clyde bridge project
    March 12, 2021
    A New Clyde bridge project is going ahead.
  • Upgrades planned for key UK link
    July 14, 2014
    Work is now to go ahead on upgrading a key stretch of the A21 road in the UK. Contractor Balfour Beatty will handle the work to widen a stretch of the A21 between Tonbridge and Pembury and also improve the road, with it becoming a dual carriageway. The €87.55 million (£69.7 million) scheme forms part of a plan by the UK Government for a series of road improvements of €30.15 billion (£24 billion) by 2021. Advance work is expected to start in the third quarter of this year with the main construction activity
  • UAE highway link underway
    May 12, 2017
    Construction is underway on a key highway link in the UAE. The project is costing close to US$218 million and connects Jumeirah district with the Parallel Roads and Al Khail Road. One of the significant portions of the work is the construction of a flyover at the intersection of the First Al-Khalil Street and Latifa Bint Hamdan. One section of the work is being carried out by the contractor, China State Company, and is due for completion in 2018. The Chinese firm’s contract will include building Umm Al-Shee