Skip to main content

Texas highway project awarded

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. Fluor Corporation heads the joint venture, which also includes Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the Texas Department of Transportation (TxDOT). The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, th
May 31, 2019 Read time: 2 mins

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. 6343 Fluor Corporation heads the joint venture, which also includes 1146 Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the 3499 Texas Department of Transportation (TxDOT).

The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, the contract includes an option for Fluor to provide capital maintenance services following construction of the project. Fluor anticipates the company will book the contract value in the third quarter of 2019.

The I-635 LBJ East Project will improve the capacity and efficiency of the portion of the I-635 loop around north and east Dallas from east of US Highway 75 to I-30. This includes significant reconstruction and improvements to the I-30 interchange and a section of I-30 from west of Gus Thomasson Road to east of N. Galloway Avenue in Dallas County, Texas.

The project includes adding a general purpose lane in each direction and rebuilding the existing managed lane in each direction to this section of I-635. The project will also feature the construction of continuous frontage roads with numerous intersection improvements for the frontage roads and cross streets to function more efficiently, including the design and construction of a signature bridge at the Skillman/Audelia intersection. The goal is to improve mobility and reduce traffic congestion in a main Dallas-Fort Worth commuter corridor that carries more than 200,000 vehicles/day. The completed project is also expected to improve safety and mobility within the I-635 corridor as well as improve the access to existing roadway connections and should be ready for traffic in 2024.

For more information on companies in this article

Related Content

  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.
  • Contract for stretch of A9 widening awarded
    August 31, 2018
    The contract for widening work to a stretch of the A9 route in Scotland has been awarded to Balfour Beatty.
  • Parsons is handling a major interchange project in North Carolina
    June 21, 2017
    Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).