Skip to main content

Texas highway project awarded

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. Fluor Corporation heads the joint venture, which also includes Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the Texas Department of Transportation (TxDOT). The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, th
May 31, 2019 Read time: 2 mins

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. 6343 Fluor Corporation heads the joint venture, which also includes 1146 Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the 3499 Texas Department of Transportation (TxDOT).

The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, the contract includes an option for Fluor to provide capital maintenance services following construction of the project. Fluor anticipates the company will book the contract value in the third quarter of 2019.

The I-635 LBJ East Project will improve the capacity and efficiency of the portion of the I-635 loop around north and east Dallas from east of US Highway 75 to I-30. This includes significant reconstruction and improvements to the I-30 interchange and a section of I-30 from west of Gus Thomasson Road to east of N. Galloway Avenue in Dallas County, Texas.

The project includes adding a general purpose lane in each direction and rebuilding the existing managed lane in each direction to this section of I-635. The project will also feature the construction of continuous frontage roads with numerous intersection improvements for the frontage roads and cross streets to function more efficiently, including the design and construction of a signature bridge at the Skillman/Audelia intersection. The goal is to improve mobility and reduce traffic congestion in a main Dallas-Fort Worth commuter corridor that carries more than 200,000 vehicles/day. The completed project is also expected to improve safety and mobility within the I-635 corridor as well as improve the access to existing roadway connections and should be ready for traffic in 2024.

For more information on companies in this article

Related Content

  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Key Botswana road network gets an upgrade
    June 30, 2014
    Representing an investment of around US$113 million, Botswana’s A1 national road between Tonota and Francistown is undergoing a major upgrade This single-lane section is being progressively transformed into a north- and southbound dual carriageway, crossing four existing river bridges along the way. A strategically important transportation route for both Botswana and the southern African region, the A1 passes through Francistown, the nation’s second largest city, heading northwards to end at the Zimbabwe b
  • $66 billion for Florida transport infrastructure
    March 11, 2025
    $66 billion will be spent on Florida’s transport infrastructure over the next five years.
  • I Lift NY crane places first girder on New York’s Tappan Zee Bridge
    June 25, 2015
    One of the world’s largest cranes has placed the first steel girder assembly for the approach span of the new NY Bridge, often called the Tappen Zee Bridge in New York. The barge-mounted I Lift NY super crane with its nearly 100m boom slowly picked up the 125m unit from its delivery barge and gently lowered it onto concrete pedestals in the Hudson River, near the Rockland County side of the bridge. The super crane will install even larger sections of the new bridge, some of which weigh around 907tonne