Skip to main content

Texas highway project awarded

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. Fluor Corporation heads the joint venture, which also includes Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the Texas Department of Transportation (TxDOT). The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, th
May 31, 2019 Read time: 2 mins

A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. 6343 Fluor Corporation heads the joint venture, which also includes 1146 Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the 3499 Texas Department of Transportation (TxDOT).

The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, the contract includes an option for Fluor to provide capital maintenance services following construction of the project. Fluor anticipates the company will book the contract value in the third quarter of 2019.

The I-635 LBJ East Project will improve the capacity and efficiency of the portion of the I-635 loop around north and east Dallas from east of US Highway 75 to I-30. This includes significant reconstruction and improvements to the I-30 interchange and a section of I-30 from west of Gus Thomasson Road to east of N. Galloway Avenue in Dallas County, Texas.

The project includes adding a general purpose lane in each direction and rebuilding the existing managed lane in each direction to this section of I-635. The project will also feature the construction of continuous frontage roads with numerous intersection improvements for the frontage roads and cross streets to function more efficiently, including the design and construction of a signature bridge at the Skillman/Audelia intersection. The goal is to improve mobility and reduce traffic congestion in a main Dallas-Fort Worth commuter corridor that carries more than 200,000 vehicles/day. The completed project is also expected to improve safety and mobility within the I-635 corridor as well as improve the access to existing roadway connections and should be ready for traffic in 2024.

For more information on companies in this article

Related Content

  • New Vietnam bridge project to cut congestion
    October 24, 2016
    A new bridge project in Vietnam’s Ho Chi Minh City will help cut traffic congestion. The project is expected to cost in the region of US$157 million and four contractors will work on the construction of the 3.2km long Bình Tiên Bridge. The plans call for the bridge to carry four traffic lanes and be from 30-40m wide, although the design has yet to be finalised. The work will be carried out in two separate sections, while the client for the Bình Tiên Bridge and Road project is Ho Chi Minh’s Transport Departm
  • US$2.1 billion Louisiana bridge deal for partners
    February 2, 2024
    A US$2.1 billion Louisiana bridge deal has been won by Sacyr, Acciona and Plenary Americas.
  • Kapsch upgrades Dallas-Fort Worth 511 traveller information system
    January 7, 2019
    Kapsch reports that it has upgraded the traveller information system and mobile app for the North Central Texas Council of Governments in Dallas-Fort Worth The new platform is powered by the Kapsch EcoTrafiX software for which Kapsch served as the lead systems integrator. Kapsch will maintain the new system for NCTCOG for two years and enhance it based on new data and customer feedback. The fully integrated system allows agencies to share information, optimise operations and balance traffic flow while pr
  • Upgrade work starts on junction of London’s orbital motorway M25
    February 20, 2015
    Work has started on a €136 million road improvement project on the UK’s London ring road, the M25 motorway. Crews from Balfour Beatty and Skanska have moved onto the interchange between the A13 national road and the M25 at junction 30 near Thurrock in the county Essex. The A13 on approach to the junction will be widened to four lanes in each direction and the junction itself will have dedicated link roads between the M25 and the A13. “Traffic at the junction is expected to grow by up to a quarter b