Skip to main content

Tenders opening for several key Brazilian highways

In Brazil the tender process is opening for the BR-060 highway. The BR-060 highway will be a substantial project as this is a 1,176km route connecting Brasilia with Goiania. The deal also includes the BR-153 and BR-262. Some 45% of the route with be dualled. Other highway tenders being opened shortly will be for the BR-163 and BR-040.
October 8, 2013 Read time: 1 min
In Brazil the tender process is opening for the BR-060 highway. The BR-060 highway will be a substantial project as this is a 1,176km route connecting Brasilia with Goiania. The deal also includes the BR-153 and BR-262. Some 45% of the route with be dualled. Other highway tenders being opened shortly will be for the BR-163 and BR-040.

Related Content

  • Concession tender for Brazilian bridge
    December 8, 2014
    Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at whic
  • Bosnian highway tender opening
    June 2, 2021
    A major Bosnian highway project is now opening for tender.
  • Controversial Brazilian highway project
    December 8, 2020
    A controversial Brazilian highway project may yet go ahead.
  • Key highway project in Colombia faces delay
    December 2, 2013
    Work on a key stretch of Colombia’s Ruta del Sol highway project is behind schedule, with the route now unlikely to open to traffic before 2017. The 21.6km section of the highway facing these delays will link Villeta and Guaduas in Cundinamarca. A key challenge is technical as the US engineering firm Gall Zeidler Consultants has warned Colombia’s infrastructure agency (ANI) that this section of the route is geologically unstable. The proposed route could be at risk from slippage and will need to be stabilis