Skip to main content

Tenders open for England’s A66 northern trans-Pennine route

A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of
October 31, 2019 Read time: 2 mins
Kirkby Thore, east of the town of Penrith, is set to benefit from a dual carriageway bypass as part of Highways England’s €1.16 billion project
A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to 8100 Highways England.


A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of the European Union (OJEU).

The €1.16 billion project – a major part of the UK government’s Road Investment Strategy -  is focusing on dualling the remaining 29km of the 80.5km route. The road is a major trucking route from to and from northern English seaports.

The A66 Northern Trans-Pennine project is known as a Nationally Significant Project (NSIP) and means Highways England must apply for a Development Consent Order (DCO) to proceed with the project.   
 
“The A66 northern trans-Pennine project will be one of the biggest infrastructure investments ever delivered in the north of England,” said Matt Townsend , Highways England senior project manager. “This is the first contract we’ll be awarding as the project moves towards the design and statutory processes phases.”
 
In July 2017 Arcadis Consultancy (UK) was appointed to help Highways England deliver initial options phases as part of the company’s project control framework (PCF). A preferred route will be announced in the spring with construction to start in the second quarter of 2020.

More information about the project is available on the website of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Highways England false https://highwaysengland.co.uk/projects/a66-northern-trans-pennine/ false false%>.

More information for potential contract tenderers can be found on the website TED: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Tenders Electronic Daily false https://ted.europa.eu/udl?uri=TED:NOTICE:504940-2019:TEXT:EN:HTML&amp;src=0 false false%>.

For more information on companies in this article

Related Content

  • International Transport Forum: public vs private policy debate
    December 4, 2014
    Simply banning cars in parts of major cities will not necessarily greatly improve the air quality over time, a new report has found. The answer for cutting carbon emissions is to get the right balance of private and public transportation along with infrastructure developed to sustain the mix, according to the International Transport Forum (ITF), a think tank within the Organisation of Economic Cooperation and Development (OECD). The ITF evaluated the potential impact of transport policies on urban carbon
  • INTERMAT launch for Topcon total stations
    January 6, 2017
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.
  • Bell will push the boundaries in ADT design
    February 6, 2013
    Bell Equipment is working on its biggest ever truck, which will offer a capacity of 55tonnes. A launch date has not yet been revealed for the hauler and technical details have yet to be revealed, however the machine will have a 4x4 drive system. Marc Schürmann managing director of Bell Equipment Europe said prototype testing for the machine will commence later this year. He said “Our competitors will be the smaller class of rigid haulers,” and he added that the aim is to offer lower fuel consumption and cap
  • INTERMAT launch for Topcon total stations
    February 3, 2012
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.