Skip to main content

Tenders open for England’s A66 northern trans-Pennine route

A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of
October 31, 2019 Read time: 2 mins
Kirkby Thore, east of the town of Penrith, is set to benefit from a dual carriageway bypass as part of Highways England’s €1.16 billion project
A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to 8100 Highways England.


A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of the European Union (OJEU).

The €1.16 billion project – a major part of the UK government’s Road Investment Strategy -  is focusing on dualling the remaining 29km of the 80.5km route. The road is a major trucking route from to and from northern English seaports.

The A66 Northern Trans-Pennine project is known as a Nationally Significant Project (NSIP) and means Highways England must apply for a Development Consent Order (DCO) to proceed with the project.   
 
“The A66 northern trans-Pennine project will be one of the biggest infrastructure investments ever delivered in the north of England,” said Matt Townsend , Highways England senior project manager. “This is the first contract we’ll be awarding as the project moves towards the design and statutory processes phases.”
 
In July 2017 Arcadis Consultancy (UK) was appointed to help Highways England deliver initial options phases as part of the company’s project control framework (PCF). A preferred route will be announced in the spring with construction to start in the second quarter of 2020.

More information about the project is available on the website of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Highways England false https://highwaysengland.co.uk/projects/a66-northern-trans-pennine/ false false%>.

More information for potential contract tenderers can be found on the website TED: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Tenders Electronic Daily false https://ted.europa.eu/udl?uri=TED:NOTICE:504940-2019:TEXT:EN:HTML&amp;src=0 false false%>.

For more information on companies in this article

Related Content

  • Hidromek has developed a long reach excavator
    February 6, 2013
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • New technical centre boosts CMS Cepcor
    January 6, 2017
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • New technical centre boosts CMS Cepcor
    April 18, 2013
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • Angry wife tells husband it’s over with a message on a freeway billboard
    October 9, 2015
    Billboards are used to advertise everything, from toothpaste to airplanes and also to get a message across, such as don’t litter the highway. But one wife in Sheffield, United Kingdom, decided to make it personal, and tell her cheating husband that it was all over.