Skip to main content

Tenders open for England’s A66 northern trans-Pennine route

A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of
October 31, 2019 Read time: 2 mins
Kirkby Thore, east of the town of Penrith, is set to benefit from a dual carriageway bypass as part of Highways England’s €1.16 billion project
A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to 8100 Highways England.


A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of the European Union (OJEU).

The €1.16 billion project – a major part of the UK government’s Road Investment Strategy -  is focusing on dualling the remaining 29km of the 80.5km route. The road is a major trucking route from to and from northern English seaports.

The A66 Northern Trans-Pennine project is known as a Nationally Significant Project (NSIP) and means Highways England must apply for a Development Consent Order (DCO) to proceed with the project.   
 
“The A66 northern trans-Pennine project will be one of the biggest infrastructure investments ever delivered in the north of England,” said Matt Townsend , Highways England senior project manager. “This is the first contract we’ll be awarding as the project moves towards the design and statutory processes phases.”
 
In July 2017 Arcadis Consultancy (UK) was appointed to help Highways England deliver initial options phases as part of the company’s project control framework (PCF). A preferred route will be announced in the spring with construction to start in the second quarter of 2020.

More information about the project is available on the website of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Highways England false https://highwaysengland.co.uk/projects/a66-northern-trans-pennine/ false false%>.

More information for potential contract tenderers can be found on the website TED: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Tenders Electronic Daily false https://ted.europa.eu/udl?uri=TED:NOTICE:504940-2019:TEXT:EN:HTML&amp;src=0 false false%>.

For more information on companies in this article

Related Content

  • New Topcon mobile apps expand job site connectivity
    March 11, 2014
    Topcon Positioning Group has announced the addition of two new mobile applications during Conexpo 2014. Available for download on the Apple App Store, Topcon Tierra™ and Sitelink3D mobile apps are designed to offer on-the-go remote connections to equipment and job sites. 
 
The Topcon Tierra mobile app lets customers login with their existing passwords and track their equipment fleets from an iPhone or iPad. "The Topcon Tierra app allows users to easily check on their fleets, fences, productivity reports
  • Sennebogen launches new 655 HD heavy-duty cycle crawler crane
    January 6, 2017
    Sennebogen’s new 655 HD heavy-duty cycle crawler crane is one of several innovations on the company’s stand at Bauma. Designed for heavy-duty tasks on construction sites and in the extractive industry, the 655 D can be used with a dragline bucket or in foundation construction. The 55tonne capacity machine can be used with a 3.5m3 Hendrix dragline bucket, for instance, and it uses two 16tonne winches driven by high-pressure regulated variable displacement hydraulic motors. There is a continuously-variable fr
  • Sennebogen launches new 655 HD heavy-duty cycle crawler crane
    February 15, 2013
    Sennebogen’s new 655 HD heavy-duty cycle crawler crane is one of several innovations on the company’s stand at Bauma. Designed for heavy-duty tasks on construction sites and in the extractive industry, the 655 D can be used with a dragline bucket or in foundation construction. The 55tonne capacity machine can be used with a 3.5m3 Hendrix dragline bucket, for instance, and it uses two 16tonne winches driven by high-pressure regulated variable displacement hydraulic motors. There is a continuously-variable fr
  • Dubuis’s cutting-edge crimping
    January 6, 2017
    France-based Dubuis is unveiling its new Neoelec in line BPL36 crimping tool at Intermat 2012.The company, bought by Stanley Black&Decker in 2006, has designed a crimper with 35kN force and 8mm stroke, weighing 2.1kg and capable of 4-185mm² hexagonal crimping.