Skip to main content

Tenders open for England’s A66 northern trans-Pennine route

A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of
October 31, 2019 Read time: 2 mins
Kirkby Thore, east of the town of Penrith, is set to benefit from a dual carriageway bypass as part of Highways England’s €1.16 billion project
A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to 8100 Highways England.


A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of the European Union (OJEU).

The €1.16 billion project – a major part of the UK government’s Road Investment Strategy -  is focusing on dualling the remaining 29km of the 80.5km route. The road is a major trucking route from to and from northern English seaports.

The A66 Northern Trans-Pennine project is known as a Nationally Significant Project (NSIP) and means Highways England must apply for a Development Consent Order (DCO) to proceed with the project.   
 
“The A66 northern trans-Pennine project will be one of the biggest infrastructure investments ever delivered in the north of England,” said Matt Townsend , Highways England senior project manager. “This is the first contract we’ll be awarding as the project moves towards the design and statutory processes phases.”
 
In July 2017 Arcadis Consultancy (UK) was appointed to help Highways England deliver initial options phases as part of the company’s project control framework (PCF). A preferred route will be announced in the spring with construction to start in the second quarter of 2020.

More information about the project is available on the website of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Highways England false https://highwaysengland.co.uk/projects/a66-northern-trans-pennine/ false false%>.

More information for potential contract tenderers can be found on the website TED: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Tenders Electronic Daily false https://ted.europa.eu/udl?uri=TED:NOTICE:504940-2019:TEXT:EN:HTML&amp;src=0 false false%>.

For more information on companies in this article

Related Content

  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • A rough ride for Denmark’s National Road Directorate
    November 1, 2019
    Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
  • Scania get tough with Off-Road truck versions
    January 6, 2017
    To address the needs of the off-road market, Scania has added bigger non-slip steps, an additional step for windscreen cleaning and light guards to its off-road range of tractive units and multi wheelers. As an option the chassis can be supplied with factory-fitted PTO hydraulics and tank to power tipper rams or similar.
  • Scania get tough with Off-Road truck versions
    April 19, 2012
    To address the needs of the off-road market, Scania has added bigger non-slip steps, an additional step for windscreen cleaning and light guards to its off-road range of tractive units and multi wheelers. As an option the chassis can be supplied with factory-fitted PTO hydraulics and tank to power tipper rams or similar.