Skip to main content

Tajikistan bridge building and infrastructure development

Tajikistan has plans to build 18 new highway bridges in its Gorno-Badakhshan region. This forms part of its strategy, ‘Strengthening of Critical Infrastructure for Protection from Natural Hazards’. Funding worth US$50 million for the programme is being provided by the International Development Association. The timeline calls for the bridge construction work to be complete by 2023.
February 27, 2018 Read time: 1 min

Tajikistan has plans to build 18 new highway bridges in its Gorno-Badakhshan region. This forms part of its strategy, ‘Strengthening of Critical Infrastructure for Protection from Natural Hazards’. Funding worth US$50 million for the programme is being provided by the International Development Association. The timeline calls for the bridge construction work to be complete by 2023.

Related Content

  • Israel's complex infrastructure project
    April 25, 2012
    The last two tenders for Israel’s Road 531 project are now being published by the Israel National Roads Company. The tenders will form part of one of the largest single infrastructure projects ever planned in Israel. These two are for a complex series of works including a three storey interchange, underground crossings for railways and roads and relocation of the coastal line for Israel Railways. Also included in the works are the construction of two large water pumping stations and a series of paths for pe
  • Ghana bridge project receiving Japan loan
    December 8, 2016
    A loan of US$100 million will help pay for a bridge spanning the Volta River in Ghana.
  • We can be Heroes
    January 11, 2023
    Paraguay’s Puente Héroes del Chaco will provide a vital transport link for the country once it is complete, Mauro Nogarin and Mike Woof report
  • Crane versatility helps with bridge building
    August 14, 2014
    The versatility and mobility of a Terex crawler crane has helped enormously with the construction of a new road bridge in Luxemburg. The Terex Superlift 3800 lattice boom crawler crane owned by Trier-based Steil Kranarbeiten was used to build a bridge in Luxemburg only two days after the same machine was used on a job in the Hunsrück mountain range. The machine was needed to lift a 440m long bridge across a valley, connecting a new section of highway.