Skip to main content

Taiwan bridge tender faces issues

Tender problems are afflicting Taiwan’s Tamkang Bridge project. The recent tender process for the project has failed. This is now the third time the tender for the project has fallen through. A new tender process for the project will open shortly. With the tender process facing such issues, the project looks likely to be further delayed until after 2020. The country’s Directorate-General of Highways (DGH) has now increased the budget allocated to the project to nearly US$310 million in a bid to ensure the w
May 5, 2017 Read time: 1 min

Tender problems are afflicting Taiwan’s Tamkang Bridge project. The recent tender process for the project has failed. This is now the third time the tender for the project has fallen through. A new tender process for the project will open shortly. With the tender process facing such issues, the project looks likely to be further delayed until after 2020. The country’s Directorate-General of Highways (DGH) has now increased the budget allocated to the project to nearly US$310 million in a bid to ensure the work will find a suitably interested party.

Related Content

  • Brazil transport maintenance planned
    May 11, 2017
    Brazil is planning a series of highway maintenance projects in a bid to tackle it serious backlog of works. Improvement works will be carried out on the BR 158, BR 163 and BR 364 highways, which have been prioritised for their importance to transport and the Brazilian economy. These routes run through Mato Grosso, Para and Rondonia states. A budget of nearly US$699 million has been set by transport infrastructure body DNIT for the highway upgrades. In all 11 projects will be carried out and the work will se
  • Turkey’s massive road investment
    March 1, 2024
    Turkey is gearing up for a massive road investment.
  • Automated testing is safer, cheaper and more thorough
    December 12, 2018
    Automated testing is improving safety during paving and saving on testing costs. But it could also help reduce long-term maintenance costs too - Kristina Smith writes Testing pavements as they are laid can be a hazardous activity. The technician may be on their hands and knees, far behind the main gang, or reaching inside the hopper to measure the temperature of the hot mix or dodging rollers to take density readings.
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.