Skip to main content

Substantial motorway expansion projects planned in Bavaria

The budget for Germany’s Motorway Directorate for Northern Bavaria will remain at around €520 million for 2017, according to media reports. For many years the budget for the Autobahndirektion Nordbayern (ADNB) was pegged between €320-380 million. This changed last year when it was boosted to €520 million, noted the newspaper Süddeutsche Zeitung. Substantial work is planned on the A3 and A6 motorways and on bridges. The 94km on the A3 between Aschaffenburg and Würzburg will be widened to six lanes by 2
February 2, 2017 Read time: 2 mins
RSSThe budget for Germany’s Motorway Directorate for Northern Bavaria will remain at around €520 million for 2017, according to media reports.

For many years the budget for the Autobahndirektion Nordbayern (ADNB) was pegged between €320-380 million. This changed last year when it was boosted to €520 million, noted the newspaper Süddeutsche Zeitung.

Substantial work is planned on the A3 and A6 motorways and on bridges. The 94km on the A3 between Aschaffenburg and Würzburg will be widened to six lanes by 2019 at an estimated cost of €1.3 billion.

Federal Motorway 3 - BAB3 or A3 – is a 778km highway that runs from the border with the Netherlands near Wesel in the northwest to the Austrian border near Passau in the southeast.

Major cities on the A3 include Düsseldorf, Leverkusen, Cologne, Wiesbaden, Frankfurt, Würzburg, Nuremberg and Regensburg. It is an important supply connection between the industrial manufacturing Rhine-Ruhr area and southern Germany. As such, long stretches are three lanes plus an emergency lane in each direction, including a 300km stretch between between Oberhausen and Aschaffenburg.

The 477km Federal Motorway 6 - also known as Via Carolina – runs between Nürnberg and the Czech border for a connection to Prague in the Czech Republic. It starts at the French border near Saarbrücken in the west and ends at the Czech border near Waidhaus in the east.

Related Content

  • Poland: GDDKiA calls two S3 dual carriageway construction tenders
    June 13, 2017
    Poland’s road authority GDDKiA is going out to tender for construction of a 16km section of the S3 dual carriageway stretching between Bolkow and Kamienna Gora.
  • Czech Republic re-tenders D4 Pribram and Pisek section as P3 deal
    January 6, 2017
    The Czech Transport Ministry has re-tendered for legal, technical and financial consultancy services regarding the first public-private partnership for a road project. The contract is for construction of a 32km section of the D4 motorway between Pribram and Pisek in South Bohemia. A previous tender for the €3.8 million project was cancelled by the Czech Anti-monopoly Office (UOHS) that suggested it contained flaws. Deadline for bids for the new tender is February 15 with construction of the remaini
  • 48 hours re-opening
    July 6, 2012
    Using demolition tools from Atlas Copco helped to maximise productivity on a highly time-sensitive project in Germany. The A3 autobahn runs from the Dutch/German border through the western part of the Ruhr area, the Cologne area, the Rhine-Main area and Bavaria down to the Austrian border at Stuben. It is one of the most heavily used highways in Germany and because of increasing traffic volumes, widening the road to six lanes has become necessary.
  • Strabag wins German A3 Autobahn contract
    July 24, 2015
    Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad