Skip to main content

STRABAG’s German highway assets increased

STRABAG has increased its stake in the A8 motorway operator PANSUEVIA. This share has been boosted from 50% to 100%. PANSUEVIA operates the autobahn stretch that runs between Ulm and Augsburg in the south of the country. SRABAG purchased the 50% stake in PANSUEVIA that was previously held by HOCHTIEF. As a result, STRABAG is now the 100% owner of the concession company operating the Ulm–Augsburg section of the A8 autobahn. Both parties agreed not to disclose the purchase price however. This section of the
October 4, 2018 Read time: 2 mins

945 STRABAG has increased its stake in the A8 motorway operator PANSUEVIA. This share has been boosted from 50% to 100%. PANSUEVIA operates the autobahn stretch that runs between Ulm and Augsburg in the south of the country.

SRABAG purchased the 50% stake in PANSUEVIA that was previously held by HOCHTIEF. As a result, STRABAG is now the 100% owner of the concession company operating the Ulm–Augsburg section of the A8 autobahn. Both parties agreed not to disclose the purchase price however.

This section of the A8 route is some 58km-long section and was opened to traffic on schedule in September 2015, having taken just over four years to build. PANSUEVIA had designed, financed and carried out the widening of the section to six lanes and took over the maintenance and operation of the section for a period of 30 years. Construction was carried out by a joint venture consisting of STRABAG Großprojekte, HOCHTIEF Infrastruktur and Ed Züblin AG. The refinancing was concluded successfully in June 2016.

For more information on companies in this article

Related Content

  • Algeria East-West Highway opening due
    September 9, 2015
    The long running saga of Algeria’s East-West Highway should come to a key point soon, when most of the route will finally be open to traffic. The 1,216km-long route will be fully operational at the end of October 2015. This is of course with the exception of the Lakhdaria section, which still requires rehabilitation work to be carried out. The repairs are expected to carry on until May or June 2016. Contractors from all over the world have been involved in the East-West highway project but certain stretches
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • Modified asphalt trials in Brazil
    October 17, 2012
    An urgent need to improve and extend its road network means that Brazil is open to innovation and new ideas - the timing looks good for Kraton and its highly modified asphalt. Kristina Smith reports On 15th August Brazilian president Dilma Rousseff announced a US$66 billion (BRL 133 billion) investment package for the country’s road and rail networks. Of that, $21 billion (BRL 42 billion) is earmarked for the upgrade or construction of 7,500km of highways through a series of concessions. “We’re starting an
  • Serbia highway 50% complete
    January 14, 2025
    A key Serbian highway is 50% complete.