Skip to main content

Strabag wins Polish road contracts worth €170 million

European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.
November 2, 2017 Read time: 1 min

European-based construction group 945 Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA).

The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million.

“Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.

All three contracts are design-and-build. The lots along the S19, also called Via Carpatia, are to be completed by April 2021.

Along the S61, the Via Baltica, the works comprise the construction of two carriageways, two rest stops, one bypass and 16 bridges, with completion for end of 2020.

For more information on companies in this article

Related Content

  • Bauer records high group revenue growth for Q3 at 22%
    November 15, 2017
    Bauer, equipment maker for ground investigation work, reports third quarter 2017 total group revenue up 22% on the previous year to just over €1,398 million. The German company said sales revenues increased by 27.5% to €1,265.6 million. However, the order backlog was €977.3 million that, while still high, was down from €1,019.0 million the previous year. This was due to a high double-digit million order backlog taken off the books after the sale of shares in a real estate company at the end of 2016.
  • STRABAG wins Uganda road contract
    February 13, 2020
    Contractor STRABAG is to rebuild a section of road in Uganda.
  • Stockholm contract for STRABAG subsidiary
    June 18, 2018
    STRABAG’s Swedish subsidiary Züblin Scandinavia will carry out a €49 million contract to construct a major interchange in Stockholm. The FSE309 Lovö interchange forms part of the massive Stockholm Bypass project, intended to divert traffic away from the city centre and cut congestion and urban pollution. Included in the project are a new connecting road with four lanes, tunnel sections, drainage systems and facilities for pedestrians and cyclists. The Lovö interchange connects the bypass to the existing Ro
  • CECE 2018 conference Rome: the sector powers up for digitisation
    March 20, 2019
    Getting the human-machine interface for equipment automation right is a lot trickier than expected. David Arminas reports from the CECE conference in Rome For many contractors, digitisation is key for improving on-site operational efficiency. But it may be time to take stock of progress and examine what does and doesn’t work. That is not to say that the anchors should be thrown out to halt development. Far from it. In the past eight months, the CECE - Committee for European Construction Equipment – led