Skip to main content

Strabag wins Polish road contracts worth €170 million

European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.
November 2, 2017 Read time: 1 min

European-based construction group 945 Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA).

The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million.

“Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.

All three contracts are design-and-build. The lots along the S19, also called Via Carpatia, are to be completed by April 2021.

Along the S61, the Via Baltica, the works comprise the construction of two carriageways, two rest stops, one bypass and 16 bridges, with completion for end of 2020.

For more information on companies in this article

Related Content

  • STRABAG wins Hungarian expressway contract
    December 20, 2017
    STRABAG has won the tendering process for a €125 million expressway construction contract in Hungary. The package of works is for the construction of the R76 expressway in western Hungary. The contract will involve building an 8.6km section of expressway along with a number of overbridges and will take 36 months to complete. The work is being carried out for the state-owned firm NIF Zrt. This will be the first section of the R76 expressway, running from Zalaegerszeg to the M7 motorway and the work will incl
  • Polish Via Carpathia section attracts 11 bids
    July 17, 2020
    Turkish contractor Kolin Insaat has submitted the lowest bid.
  • Polish projects awarded
    February 3, 2021
    A series of Polish road projects have been awarded.
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.