Skip to main content

Strabag wins Polish road contract

Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
September 17, 2018 Read time: 2 mins
Austrian contractor 945 Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.


Strabag will hold a 92% stake in the consortium to build the link, with 3302 Budimex holding the rest of the share. Construction should start at the end of 2018 and is expected to take 32 months to complete. The project includes the construction of 16 bridges and three rest areas as well as other civils works. Strabag is already working on a design build contract for a 16km stretch of the A1 highway and will be able to carry over some of its knowledge for this latest deal.

For more information on companies in this article

Related Content

  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • $337 million NC road deal for Lane
    July 18, 2025
    Lane Construction has won a $337 million road deal for NC.
  • Stockholm tunnel section awarded
    November 21, 2017
    Contractor STRABAG will construct an additional section of road tunnel for Stockholm’s new bypass project. The contract is worth around €45 million and involves building two parallel bores with a total length of 2.5km for the Akalla tunnel section. The Stockholm bypass runs around the Swedish capital and is currently the largest road construction and tunnelling project in the country. The parallel tunnel bores will both be around 1.23km long and will be driven using conventional drilling and blasting
  • Poland plans push-starting project
    February 28, 2012
    In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.