Skip to main content

STRABAG wins Hungarian expressway contract

STRABAG has won the tendering process for a €125 million expressway construction contract in Hungary. The package of works is for the construction of the R76 expressway in western Hungary. The contract will involve building an 8.6km section of expressway along with a number of overbridges and will take 36 months to complete. The work is being carried out for the state-owned firm NIF Zrt. This will be the first section of the R76 expressway, running from Zalaegerszeg to the M7 motorway and the work will incl
December 20, 2017 Read time: 2 mins
945 STRABAG has won the tendering process for a €125 million expressway construction contract in Hungary. The package of works is for the construction of the R76 expressway in western Hungary. The contract will involve building an 8.6km section of expressway along with a number of overbridges and will take 36 months to complete. The work is being carried out for the state-owned firm NIF Zrt. This will be the first section of the R76 expressway, running from Zalaegerszeg to the M7 motorway and the work will include building the Hollád interchange.


The 8.6km section comprises several overpasses, including a reinforced concrete bridge over the river Zala as well as two railway bridges. The construction works are expected to last four years. “An especially challenging aspect of this project are the marshes and moors along the planned route consisting of soft silt and clay. This makes proper ground treatment and conditioning especially important,” said Thomas Birtel, CEO of STRABAG.

For more information on companies in this article

Related Content

  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.
  • Strabag’s Züblin subsidiary wins key A 100 Berlin urban motorway contract
    May 28, 2014
    Strabag subsidiary Züblin has been awarded the €73 million contract to build a 700 metre section of the A 100 urban motorway in Berlin, Germany. Situated at Sonnenallee Junction, the works will see Züblin not only construct a new dual-track commuter rail bridge and a single-track long-distance railway bridge, each with 68m spans; but also set up diaphragm walls, establish underwater concrete floors, install uplift and pit lining anchors, and drive the sheet piling and bored piles. The contract also encomp
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.