Skip to main content

Strabag to upgrade Austria’s A10 Oswaldibergtunnel

Austrian construction group Strabag will modernise the A10 Oswaldibergtunnel for Asfinag, Austria’s national motorway operator. Work on both tubes, each 4.3km long, will start this month and be finished in June 2017. The €34 million contract includes upgrading the road and tunnel surfaces as well as reinstalling all electrical and mechanical equipment. Thomas Birtel, chief executive of the Strabag Group, said in a statement that the contract will be covered by the group’s construction, engineering and c
July 13, 2015 Read time: 1 min
Austrian construction group 945 Strabag will modernise the A10 Oswaldibergtunnel for 4178 Asfinag, Austria’s national motorway operator.

Work on both tubes, each 4.3km long, will start this month and be finished in June 2017.

The €34 million contract includes upgrading the road and tunnel surfaces as well as reinstalling all electrical and mechanical equipment.

Thomas Birtel, chief executive of the Strabag Group, said in a statement that the contract will be covered by the group’s construction, engineering and communication technology division.

The Oswaldibergtunnel in the province of Corinthia, is part of the Tauern motorway and was built to bypass the town of Villach. It was opened in 1987 had a complete safety upgrade in 2004. Capacity is around 25,000 vehicles a day.

For more information on companies in this article

Related Content

  • Strabag on the edge with a Dynapac DF145CS paver from Atlas Copco
    June 10, 2015
    When asphalting the inside of the newly raised edge of a water dam, Austrian road construction company Strabag faced a challenge. The paver had to be operated at an angle of between 34-41 degrees with material fed into the hopper from a ledge just 2.8m wide on the edge of the dam. The Waldeck 2 kidney-shaped hydroelectric station is located on a mountaintop about 500m above sea level on Lake Eder in central Germany. The dam, owned by global energy group E.ON, has a perimeter of about 3km. An important pa
  • Vahostav-SK and TuCon to build Slovakia’s Presov northern bypass
    July 4, 2019
    Slovak contractors Vahostav-SK and TuCon will build the first stage of the 4.3km northern bypass in Presov on the R4 dual carriageway. The contract was awarded in an open tender by Slovakia’s motorway company NDS. The consortium offered the lowest price of just under €143 million against around €170 million as estimated by NDS which says work will start this summer. NDS also said that it had received five firm bids for the work which will likely take three years and nine months, for completion in 2
  • Ahmedabad airport roll-out for Dynapac
    September 7, 2022
    Dynapac machines have set production records during the upgrade of Sardar Vallabhbhai Patel International Airport in the Indian state of Gujarat.
  • Colorado river bridge relieves congestion
    February 7, 2012
    Built in the shadow of the Hoover Dam, a new bridge is set to takes its place as another major tourist attraction. Patrick Smith reports