Skip to main content

Strabag picks up Czech D1 motorway deal

Strabag is to modernise nearly 15km of the D1 motorway in the Czech Republic under a contract worth nearly €73 million. Work includes complete renewal of the cement concrete surface between Velký Beranov and Měřín to be done within three years. Working on the project are the consortium leader Strabagm based in Austria, and its two partner companies Metrostav and EUROVIA’s Czech subsidiary. The project will begin with a temporary widening of the motorway in the direction of Prague to allow full reno
December 21, 2018 Read time: 2 mins
Strabag’s 15km contract is part of a larger 162km upgrade to the Czech republic’s D1 motorway

945 Strabag is to modernise nearly 15km of the D1 motorway in the Czech Republic under a contract worth nearly €73 million.

Work includes complete renewal of the cement concrete surface between Velký Beranov and Měřín to be done within three years.

Working on the project are the consortium leader Strabagm based in Austria, and its two partner companies Metrostav and 3281 EUROVIA’s Czech subsidiary.

The project will begin with a temporary widening of the motorway in the direction of Prague to allow full renovation of the road surface in the direction of Brno. First, the roadway will be removed, the sublayers recycled and new surfacing laid. This will be followed by the renewal of the roadway in the direction of Prague.

Also included is the upgrade of 10 motorway bridges, the demolition and reconstruction of a motorway overpass and construction of an animal overpass. Old noise barriers will be demolished and news ones created, according to the company.

Strabag’s 15km contract win is part of a larger project to upgrade 162km of the D1 from the capital Prague through to Brno. Work is being divided into 21 sections.

Strabag has been working in the Czech republic since 1991. “We have already proven our expertise in projects such as construction of the D3 motorway linking Prague with the Austrian border,” said Thomas Birtel, Strabag’s chief executive.

For more information on companies in this article

Related Content

  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
  • STRABAG sees profits grow
    April 29, 2016
    Construction company STRABAG has seen its financial performance improve during the 2015 financial year. The firm’s earnings before interest and taxes (EBIT) reached €341.04 million, an increase of 21% over the previous year. Double-digit growth was also achieved in net income (after minorities), with a gain of 22% to €156.29 million, while earnings/share grew from €1.25 to €1.52. These developments have compelled the management board to propose to the AGM planned for June 2016 a dividend of €0.65, which wil
  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li
  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion