Skip to main content

Strabag lands Dubrovnik Airport deal for runway work

Strabag lands Dubrovnik Airport deal for runway work
September 8, 2017 Read time: 1 min
Dubrovnik Airport runways: waiting for 247,000 tonnes of asphalt and 58,000m³ of concrete

European-based construction group 945 Strabag is renovating the runways under a €122 million to modernise and expand Dubrovnik Airport in Croatia.

Works, including upgrading of runway lighting system should be completed by the autumn of 2019. The works also include the construction of a rescue and fire station, a hangar and several service and administration buildings.

The contract is being carried out by a joint venture in which Strabag holds a 53.92 % share.

Dubrovnik Airport plays a crucial role in providing access to the old historic city, Thomas Birtel, chief executive of Strabag. The project involves the excavation of more than 1.5 million m³ of material and will require 247,000 tonnes of asphalt and 58,000m³ of concrete.

For more information on companies in this article

Related Content

  • Tender evaluation nears for Croatia’s Peljeski Bridge Project
    September 22, 2017
    Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
  • Airport recycling
    July 17, 2012
    Extec has supplied crushing and screening equipment that is being used to recycle materials and help in the renovation of the Pulkovo Airport near St Petersburg in Russia. An array of Extec machines are being used by local firm Recycle of Materials (ROM), which is one of Russia's leading firms in the materials recycling sector. ROM has extensive experience in demolishing and recycling concrete buildings built in the 1950s and 60s that were constructed using poor-quality concrete and is now diversifying into
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports