Skip to main content

Strabag lands Dubrovnik Airport deal for runway work

Strabag lands Dubrovnik Airport deal for runway work
September 8, 2017 Read time: 1 min
Dubrovnik Airport runways: waiting for 247,000 tonnes of asphalt and 58,000m³ of concrete

European-based construction group 945 Strabag is renovating the runways under a €122 million to modernise and expand Dubrovnik Airport in Croatia.

Works, including upgrading of runway lighting system should be completed by the autumn of 2019. The works also include the construction of a rescue and fire station, a hangar and several service and administration buildings.

The contract is being carried out by a joint venture in which Strabag holds a 53.92 % share.

Dubrovnik Airport plays a crucial role in providing access to the old historic city, Thomas Birtel, chief executive of Strabag. The project involves the excavation of more than 1.5 million m³ of material and will require 247,000 tonnes of asphalt and 58,000m³ of concrete.

For more information on companies in this article

Related Content

  • AfPA appoints new chairman, Dante Cremasco
    May 20, 2022
    Cremasco, head of road services at integrated services provider Downer, takes over during a difficult time for Australian infrastructure contracts due to rapidly rising material costs.
  • Beijing airport runway features novel asphalt solution
    December 7, 2017
    Beijing ranks amongst the five busiest airports across the globe and its runway surfaces face tough stresses as a result. Over 94 million passengers flew through Beijing Capital Airport (BCA) in 2016 and as many as 70 flights/hour can take off and land during peak times. The 60m-wide middle runway of Beijing Capital International Airport is the busiest of the three runways, with a landing and take-off flight ratio of up to 40%. This runway was first rehabilitated in 1996 and then repaired in 2013 and 2015
  • Houston Airport paving work for Dynapac
    May 23, 2022
    Equipment from Dynapac is playing an important role in improving facilities at Houston Airport. The firm´s TH E technology has been employed to deliver a surface to grade, with high levels of pre-compaction and also automation.
  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.