Skip to main content

Strabag lands Dubrovnik Airport deal for runway work

Strabag lands Dubrovnik Airport deal for runway work
September 8, 2017 Read time: 1 min
Dubrovnik Airport runways: waiting for 247,000 tonnes of asphalt and 58,000m³ of concrete

European-based construction group 945 Strabag is renovating the runways under a €122 million to modernise and expand Dubrovnik Airport in Croatia.

Works, including upgrading of runway lighting system should be completed by the autumn of 2019. The works also include the construction of a rescue and fire station, a hangar and several service and administration buildings.

The contract is being carried out by a joint venture in which Strabag holds a 53.92 % share.

Dubrovnik Airport plays a crucial role in providing access to the old historic city, Thomas Birtel, chief executive of Strabag. The project involves the excavation of more than 1.5 million m³ of material and will require 247,000 tonnes of asphalt and 58,000m³ of concrete.

For more information on companies in this article

Related Content

  • German highway contract for STRABAG
    August 10, 2021
    A major German highway contract will be worked on by STRABAG.
  • The power of water
    July 18, 2012
    The popularity of hydrodemolition is growing worldwide and was the specified solution for work on two vital Swedish links The hydrodemolition technique, which uses high pressure water jets to remove damaged concrete from various structures, is playing a crucial role in the major restoration of the vital Central Bridge and Söderled Tunnel in the centre of Sweden's capital Stockholm. The 1,550m dual two-lane rectangular box Söderled Tunnel and connecting dual two and three-lane Central Bridge are a vital 2.6k
  • Rebuilding a scenic route in South Africa
    April 20, 2018
    Equipment from Wirtgen has played a key role in the rehabilitation of a major route in Cape Town. The scenic Camps Bay Drive provides access to Camps Bay and Hout Bay Based on the project brief and geometric analysis, Camps Bay Drive required widening to cope with high volumes of tourist traffic and MyCiti buses. In order to minimise the impact on traffic, the design brief targeted construction outside the summer peak tourist season and also required investigation into shortened construction periods. The
  • Asphalt plant assists at airport project
    December 19, 2017
    An asphalt plant from ADM has helped in the reconstruction of the runway at South Caicos Airport. Herzog Caribbean recently took delivery of its new asphalt plant to supply material for the runway overhaul on South Caicos Island. The plant, an ADM EX120, delivered 23,000tonnes of material for the project without any downtime, allowing for an April 2017 completion. A division of Missouri-based Herzog Contracting, Herzog Caribbean operates out of Providenciales, the capital city of Turks & Caicos, British We