Skip to main content

Strabag lands Dubrovnik Airport deal for runway work

Strabag lands Dubrovnik Airport deal for runway work
September 8, 2017 Read time: 1 min
Dubrovnik Airport runways: waiting for 247,000 tonnes of asphalt and 58,000m³ of concrete

European-based construction group 945 Strabag is renovating the runways under a €122 million to modernise and expand Dubrovnik Airport in Croatia.

Works, including upgrading of runway lighting system should be completed by the autumn of 2019. The works also include the construction of a rescue and fire station, a hangar and several service and administration buildings.

The contract is being carried out by a joint venture in which Strabag holds a 53.92 % share.

Dubrovnik Airport plays a crucial role in providing access to the old historic city, Thomas Birtel, chief executive of Strabag. The project involves the excavation of more than 1.5 million m³ of material and will require 247,000 tonnes of asphalt and 58,000m³ of concrete.

For more information on companies in this article

Related Content

  • Dual layer, hot to hot paving at German airport
    August 18, 2015
    An airport in Germany has seen the use of very innovative asphalt paving techniques, with the use of dual-layer, hot-to-hot working. The method was used to meet a very tight schedule for the runway rebuilding work, while also delivering the high quality required. Two InLine Pave trains from Vögele were used at Rostock-Laage Airport to lay a new surface and binder course. The operation was innovative as the process used both hot-to-hot, echelon paving as well as dual layer, hot-on-hot working. Using this
  • Improved runway facility for Florida’s Fort Lauderdale Airport
    August 18, 2015
    Florida’s Fort Lauderdale- Hollywood International Airport (FLL) is now benefiting from an upgraded runway. A key portion of the work has been carried out using equipment from Minnich. The airport handles about 23 million passengers/year and with about 3 million of those from international flights, there was a need to develop the facility to cope with the larger aircraft used on international flights. The Broward County Aviation Department was responsible for the work and specified that the runway exp
  • Power Curbers ramps up Florida projects
    September 5, 2022
    A Florida company is using Power Curbers machines for major runway work in the US state.
  • Caterpillar smoothens Colombian airport
    August 21, 2013
    Cartagena, Colombia’s coastal city attracts large numbers of visitors, generating heavy traffic through the Rafael Nuñez International Airport. However the surface of the runway had suffered from heavy wear, r esulting in bumpy landings and this was in need of repair. In addition, engineers wanted to create a graded, ramped approach to aid with both take-offs and landings. However, the volume of air traffic using the airport meant that construction work had to take place in a tight timeframe, between mi