Skip to main content

Strabag closes in on Poland’s S8 Marki-Kobylka contract

Strabag has nudged into the lead for Poland’s retender of the dual lane S8 section between the Marki and Kobylka junctions, previously held by Salini-Impreglio. Five offers were on the table for the deal with Strabag offering €38 million, well above the €32 million that was budgeted for by GDDKiA, Poland’s road authority. Other bids came from a consortium headed by Warszawskie Przedsiebiorstwo Mostowe Mosty at nearly €40 million, a PORR and Unibep consortium offere at almost €59 million, a bid by I
August 19, 2019 Read time: 2 mins
945 Strabag has nudged into the lead for Poland’s retender of the dual lane S8 section between the Marki and Kobylka junctions, previously held by Salini-Impreglio.  


Five offers were on the table for the deal with Strabag offering €38 million, well above the €32 million that was budgeted for by 1361 GDDKiA, Poland’s road authority.

Other bids came from a consortium headed by Warszawskie Przedsiebiorstwo Mostowe Mosty at nearly €40 million, a PORR and Unibep consortium offere at almost €59 million, a bid by Intercor at nearly €65 million and one by and Budimex at just over €39 million.

GDDKiA expects to sign a contract in November with completion set for spring 2021.
 
The contract is one two that make up construction of a 15km section of the S8 expressway. The consortium from Salini was responsible for the implementation of the first contract. The second has already been completed.

More than 500km of the planned 565km S8 road have been built since construction started in 2003. It runs from Wrocław to Białystok via Łódź and the capital Warsaw.

Originally, the road was to continue to the border with Lithuania, but in 2009 the plans were changed and currently the S61 will branch off the S8 and go to the border.

The S8 section from Warsaw to the S61 interchange is planned to become part of the Via Baltica, a stretch of the European route E 67.

Via Baltica runs from the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. The final stretch between the Estonian capital Tallinn and the Finnish capital Helsinki is by ferry, a two-and-a-half hour crossing of the Gulf of Finland.

For more information on companies in this article

Related Content

  • Kenya highway projects starting
    March 11, 2019
    Construction work is starting on two important road projects in Kenya. These are for the Dongo Kundu Southern Bypass and for the Mau Highway. The Mau highway project is worth US$2 billion and forms part of the route that links Kenya’s key port at Mombasa through its capital Nairobi to the border with neighbouring Uganda. The 180km Nairobi-Nakuru-Mau section of the A104 route will feature two lanes in either direction. The deal is being handled under a package that includes design, financing, maintenance a
  • Romania tenders for two sections of Pitesti-Sibiu motorway
    May 14, 2018
    Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1. Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route. Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the b
  • Key road deals awarded for the Czech Republic
    November 28, 2023
    Road deals have been awarded for the Czech Republic
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi