Skip to main content

Strabag and GBS-Infrastructure to build Sofia-Kalotina motorway

Austrian construction firm Strabag and Bulgarian firm GBS-Infrastructure Construction have won the contract to build the 32.4 km Sofia-Kalotina motorway. Cost of the 32.4kmn four-lane project is estimated at €120 million with completion set for 2020. The Kalotina motorway will run from the capital Sofia’s ring road to the border town of Kalotina where it will connect with Serbia’s A4 motorway. It is also part of 6,100km 10-country European route E80 running from the Portuguese capital Lisbon to the
August 2, 2018 Read time: 1 min

Austrian construction firm 945 Strabag and Bulgarian firm GBS-Infrastructure Construction have won the contract to build the 32.4 km Sofia-Kalotina motorway.

Cost of the 32.4kmn four-lane project is estimated at €120 million with completion set for 2020.

The Kalotina motorway will run from the capital Sofia’s ring road to the border town of Kalotina where it will connect with Serbia’s A4 motorway. It is also part of 6,100km 10-country European route E80 running from the Portuguese capital Lisbon to the Turkish town of Gürbulak on the border with Iran.

For more information on companies in this article

Related Content

  • Bulgaria lets contract for Struma Motorway’s Zheleznitsa Tunnel
    February 15, 2019
    A consortium including local firms GP Group, Global Construction and Via Plan will build the 2km Zheleznitsa Tunnel, part of the Struma Motorway. The contract is worth around €97.5 million and the tunnel will be the longest in Bulgaria. The EU Cohesion Fund will co-finance the project, along with the Bulgarian government under the Operational Programme Transport and Transport Infrastructure 2014-2020. Completion is set for the end of 2023. Two previous tender processes to award the construction con
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • STRABAG building two more Polish routes
    January 12, 2018
    Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t