Skip to main content

Slovakia’s Ruzomberok bypass and tunnel face severer delays

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
September 4, 2017 Read time: 1 min

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years.

The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová.

Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Slovakia Slovakia false https://en.wikipedia.org/wiki/Slovakia true false%>. It lies around 260km from the Slovakian capital %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Bratislava Bratislava false https://en.wikipedia.org/wiki/Bratislava true false%>.

The delay has been caused by a landslide near the tunnel that is being planned through the Čebrať hills above Ružomberok. Because of continuing geological concern, the National Highway Company 5891 NDS had rerouted the road and the tunnel must now by 3.6km long, instead of only 2km, according to media reports.

For more information on companies in this article

Related Content

  • Allison is introducing new transmission technologies
    March 15, 2013
    Allison aims to retain its strong position in the transmission market with its latest array of products. Key machines featuring Allison transmissions will include equipment from Astra, Hino, Mercedes, Randon and Perlini. The Mercedes Zetros 1833 is a novel 4x4 underground mining tractor, while Bell is showing its new B25E and B30E articulated dump trucks, all of which are equipped with the latest Allison 3000 Series fully automatic transmissions. Rigid truck transmissions from Allison will be fitted to the
  • Lintec showcases redesigned CSD 1500 plant at bauma
    February 12, 2013
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
  • Tata Steel invests for growth
    April 18, 2013
    Tata Steel is aiming to double its worldwide steel sales by 2017 in the lifting and excavating sector from its current volume of 500,000tonnes. To achieve this target the company has recently invested €40million to improve its product portfolio, by developing its quenched and tempered, and advanced downstream processing facilities in the UK. Tata Steel said it delivers a wider range of differentiated steel products to the lifting and excavating industry than any other steel producer in the world, and provid
  • Nylacast-engineered polymers are self-lubricating and offer high resistance to abrasion
    April 18, 2013
    Nylacast offers an extensive range of polymer solutions for OEMs when it comes to sourcing alternative lightweight wear parts and components. Using CAD/CAM technology, the company offers customers an in-house design service that includes material selection advice, service and support for producing self-lubricating materials with high-impact strength and high resistance to abrasion while remaining light in weight. Nylacast said its components are 86% lighter than the equivalent component manufactured from st