Skip to main content

Slovakia’s Ruzomberok bypass and tunnel face severer delays

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
September 4, 2017 Read time: 1 min

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years.

The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová.

Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Slovakia Slovakia false https://en.wikipedia.org/wiki/Slovakia true false%>. It lies around 260km from the Slovakian capital %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Bratislava Bratislava false https://en.wikipedia.org/wiki/Bratislava true false%>.

The delay has been caused by a landslide near the tunnel that is being planned through the Čebrať hills above Ružomberok. Because of continuing geological concern, the National Highway Company 5891 NDS had rerouted the road and the tunnel must now by 3.6km long, instead of only 2km, according to media reports.

For more information on companies in this article

Related Content

  • Terex Genie launches world’s largest boom
    April 18, 2013
    Terex aerial work platform business Genie has unveiled, what it claims, is the world’s biggest self-propelled boom, the SX-180. Intended primarily for oil and gas industries, construction and industrial maintenance, the boom has a 54.9m vertical working height and a 24.4m horizontal reach. Equipped with a 2.44m by 0.91m basket, and a 3.05m rotating jib, the machine has a working capacity of 340kg.
  • VIDEO: Never give a queen a lift
    May 27, 2016
    A driver in Wales drove around for a day with an estimated 20,000 unwelcome passengers until the problem got to be too evident. The video shows the car of the 65-year-old grandmother, finally parked in the small town of Haverfordwest, literally buzzing with bees. Apparently, a queen bee got stuck on the vehicle and her community decided to follow the car and stick to it as well. It took two members of the Pembrokeshire Beekeepers' Association, a park ranger and some local people to coax the travelers
  • Loadrite introduces its 360° load-out management system
    April 18, 2013
    The new Loadrite 360° management system has been designed to boost efficiency in quarries by integrating communication across all stages of an order for faster turnarounds and maximised payloads. Loadrite said that the system improves communication throughout the load-out operations. It is aimed at providing quarry managers with the tools they need to get the most from both staff and equipment. Benefits include lower costs per tonne and optimised truck utilisation, said the company.
  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the