Skip to main content

Slovakia’s Ruzomberok bypass and tunnel face severer delays

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
September 4, 2017 Read time: 1 min

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years.

The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová.

Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Slovakia Slovakia false https://en.wikipedia.org/wiki/Slovakia true false%>. It lies around 260km from the Slovakian capital %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Bratislava Bratislava false https://en.wikipedia.org/wiki/Bratislava true false%>.

The delay has been caused by a landslide near the tunnel that is being planned through the Čebrať hills above Ružomberok. Because of continuing geological concern, the National Highway Company 5891 NDS had rerouted the road and the tunnel must now by 3.6km long, instead of only 2km, according to media reports.

For more information on companies in this article

Related Content

  • Algeria to engage Japanese government over dispute with Cojaal
    January 14, 2015
    The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.
  • Access safety and jobs with IPAF
    January 6, 2017
    IPAF (the International Powered Access Federation) will use Bauma to take visitors through its Safety Experience, a walk-through learning experience on how to use powered access equipment safely and effectively. The outdoor stand will highlight the association’s “Spread the load” campaign promoting the correct use of spreader plates, share results and findings from its growing accident reporting database. Falls from height are still the single largest killer in the workplace, says IPAF, and powered access i
  • Access safety and jobs with IPAF
    February 15, 2013
    IPAF (the International Powered Access Federation) will use Bauma to take visitors through its Safety Experience, a walk-through learning experience on how to use powered access equipment safely and effectively. The outdoor stand will highlight the association’s “Spread the load” campaign promoting the correct use of spreader plates, share results and findings from its growing accident reporting database. Falls from height are still the single largest killer in the workplace, says IPAF, and powered access i
  • Video: Chinese cars levitate at crossroads
    December 23, 2015
    Watch as the vehicles appear to be grabbed by some invisible power, tossed around and chucked backwards up in the air. Startled onlookers stare at the van drivers struggle to get out of their cabs.