Skip to main content

Slovakia’s Ruzomberok bypass and tunnel face severer delays

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
September 4, 2017 Read time: 1 min

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years.

The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová.

Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Slovakia Slovakia false https://en.wikipedia.org/wiki/Slovakia true false%>. It lies around 260km from the Slovakian capital %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Bratislava Bratislava false https://en.wikipedia.org/wiki/Bratislava true false%>.

The delay has been caused by a landslide near the tunnel that is being planned through the Čebrať hills above Ružomberok. Because of continuing geological concern, the National Highway Company 5891 NDS had rerouted the road and the tunnel must now by 3.6km long, instead of only 2km, according to media reports.

For more information on companies in this article

Related Content

  • Wassara offers water drilling option
    January 28, 2013
    Innovative water-powered drilling technology developed in Sweden is claimed to drill straighter and deeper than conventional systems. Said to be environmentally friendly, the Wassara drilling technology has been developed and perfected over 20 years by Swedish iron ore producer LKAB. Using the Wassara drills has allowed LKAB to drastically cut operating costs. A complete range is now offered and suits applications within ground engineering, dam rehabilitation and exploration drilling. The heart in the syste
  • Chengyu makes tracks for worldwide market
    April 22, 2013
    Chinese undercarriage component manufacturer Chengyu Machinery Equipment has set its sights on increasing exports to world markets. The company makes track rollers, carrier rollers, idlers, sprockets and track chain assemblies for machines from two to 40tonnes and exports 60% of its output. It said its products are crack- and abrasion-resistant and with high quality control procedures – only 25 parts in a million fail its quality control. Both its product delivery and after-sales service levels are said to
  • Losing your car ain’t as hard as you would think
    April 29, 2015
    Thankfully it doesn’t happen too often, but forgetting where you parked your car can be an embarrassing moment, or several days, as one man in the UK recently found. Jason Matthews, 40, ran the Manchester City Marathon on April 19 in five hours and 11 minutes and then spent an additional several hours looking for his Saab 93 Sport. He said he couldn’t recall where he had parked the vehicle. He walked back around some of the 26-mile – nearly 42km - course, before driving around in a taxi for 40 minutes an
  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    January 6, 2017
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a