Skip to main content

Slovakia’s Ruzomberok bypass and tunnel face severer delays

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
September 4, 2017 Read time: 1 min

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years.

The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová.

Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Slovakia Slovakia false https://en.wikipedia.org/wiki/Slovakia true false%>. It lies around 260km from the Slovakian capital %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Bratislava Bratislava false https://en.wikipedia.org/wiki/Bratislava true false%>.

The delay has been caused by a landslide near the tunnel that is being planned through the Čebrať hills above Ružomberok. Because of continuing geological concern, the National Highway Company 5891 NDS had rerouted the road and the tunnel must now by 3.6km long, instead of only 2km, according to media reports.

For more information on companies in this article

Related Content

  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Dana Rexroth will launch the high-efficiency R2 hydromechanical variable transmission for smaller machines
    January 6, 2017
    Dana Rexroth Transmission Systems, the joint venture Dana and Bosch Rexroth, is to launch the R2 hydromechanical variable transmission (HVT). The modular transmission uses both a hydrostatic drive and a mechanical gearbox to deliver fuel savings of up to 25% compared to a torque converter transmission. Designed to work with engine outputs of 134-193kW (180-260hp), the R2 is suitable for use in wheeled loaders, motor graders, lift trucks and a variety of off-highway applications. The hydrostatic drive unit
  • Dana Rexroth will launch the high-efficiency R2 hydromechanical variable transmission for smaller machines
    February 7, 2013
    Dana Rexroth Transmission Systems, the joint venture Dana and Bosch Rexroth, is to launch the R2 hydromechanical variable transmission (HVT). The modular transmission uses both a hydrostatic drive and a mechanical gearbox to deliver fuel savings of up to 25% compared to a torque converter transmission. Designed to work with engine outputs of 134-193kW (180-260hp), the R2 is suitable for use in wheeled loaders, motor graders, lift trucks and a variety of off-highway applications. The hydrostatic drive unit
  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe