Skip to main content

Slovakia’s D1 Budimir-Bidovce motorway stretch gets EU backing

Slovakia’s motorway company NDS and the Transport Ministry have agreed a subsidy of nearly €204 million for a D1 section. The EU will cover 85% of the project cost, while the remaining 15% will be covered by the government for construction the 14.5km D1 motorway between Budimir and Bidovce, near the city of Kosice. The section, being built by Skanska for almost €237 million, is on schedule for completion by the end of 2019. The stretch will be part of the eastern by-pass of Kosice and in Budimir it wi
November 2, 2018 Read time: 1 min

Slovakia’s motorway company 5891 NDS and the Transport Ministry have agreed a subsidy of nearly €204 million for a D1 section.

The EU will cover 85% of the project cost, while the remaining 15% will be covered by the government for construction the 14.5km D1 motorway between Budimir and Bidovce, near the city of Kosice.

The section, being built by 2296 Skanska for almost €237 million, is on schedule for completion by the end of 2019. The stretch will be part of the eastern by-pass of Kosice and in Budimir it will connect to D1 from Presov.

For more information on companies in this article

Related Content

  • Slovakia’s Ruzomberok bypass and tunnel face severer delays
    September 4, 2017
    The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Skanska awarded Slovakian highway contract
    May 5, 2021
    Skanska has been awarded a major Slovakian highway contract.